Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13731-13740 of 15561 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1907 | Project ID: 1907 DEA: 041E2504 | 04-SM-82-0.0/2.7 | Cold plane pavement and place hot mix asphalt (type A). | SAN MATEO COUNTY IN ATHERTON AND MENLO PARK FROM SANTA CLARA COUNTY LINE TO BERKSHIRE AVENUE | 05/05/2011 | 1 (05/05/2011) | Details Personnel CEM-3701 Report |
210302 | Project ID: 210302 DEA: 043E7904 EFIS: 0413000299 | 04-SM-101-23.7 | SPOT BLAST CLEAN AND PAINT THE ENTIRE STEEL GIRDERS AND BENT CAPS. | SAN MATEO COUNTY IN BRISBANE AT SIERRA POINT OVERHEAD | 12/27/2017 | 1 (07/09/2015) | Details Personnel CEM-3701 Report |
210501 | Project ID: 210501 DEA: 044G6304 EFIS: 0412000621 | 04-SM-280-R25.5 | REPAIR SIDE SLOPE AND CONSTRUCT ROCK SLOPE PROTECTION AND DRAINAGE | SAN MATEO COUNTY IN DALY CITY AT 0.1 MILE SOUTH OF D STREET ON-RAMP SEPARATION | 12/27/2017 | 1 (10/16/2015) | Details Personnel CEM-3701 Report |
212260 | Project ID: 212260 DEA: 040K9604 EFIS: 0416000174 | 04-SM-35-R28.7/30.0 | HM1 Project. REPLACE ASPHALT CONCRETE PAVEMENT. | SAN MATEO COUNTY IN DALY CITY FROM ROUTE 35/1 SEPARATION TO 0.3 MILE NORTH OF WESTMOOR AVENUE | 08/08/2018 | 1 (08/10/2017) | Details Personnel CEM-3701 Report |
7155 | Project ID: 7155 DEA: 042E4504 | 04-SM-35-29.7/31.5 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT (HMA). | SAN MATEO COUNTY IN DALY CITY FROM WESTMOORE AVENUE TO SAN FRANCISCO COUNTY LINE | 08/31/2012 | 1 (08/31/2012) | Details Personnel CEM-3701 Report |
215649 | Project ID: 215649 DEA: 043G4884 EFIS: 0412000088 | 04-SM-92-R14.4/R18.8 | CLEAN AND PAINT STEEL BRIDGE TOWERS, REPLACE HIGH STRENGTH BOLTS. | SAN MATEO COUNTY IN FOSTER CITY FROM SAN MATEO-HAYWARD BRIDGE TO ALAMEDA COUNTY LINE | 1 (03/29/2021) | Details Personnel CEM-3701 Report | |
7682 | Project ID: 7682 DEA: 040G1704 EFIS: 0400020865 | 04-SM-1-28.2 | INSTALL SIGNAL AND LIGHTING. | SAN MATEO COUNTY IN HALF MOON BAY AT POPLAR STREET | 01/17/2014 | 1 (10/15/2012) | Details Personnel CEM-3701 Report |
1908 | Project ID: 1908 DEA: 041E2604 | 04-SM-92-0.0/3.2 | Cold plane and place hot mix asphalt (Type A). | SAN MATEO COUNTY IN HALF MOON BAY FROM ROUTE 1 TO PILARCITOS CREEK ROAD | 05/05/2011 | 1 (05/05/2011) | Details Personnel CEM-3701 Report |
7201 | Project ID: 7201 DEA: 042E6304 | 04-SM-84-8.3/17.0 | REPLACE HOT MIX ASPHALT. | SAN MATEO COUNTY IN LA HONDA AND SKY LONDA ON ROUTE 84 FROM PESCADERO ROAD TO 1 MILE NORTH OF FRIARS LANE | 11/20/2012 | NOT VERIFIED | Details Personnel CEM-3701 Report |
7307 | Project ID: 7307 DEA: 042E5404 | 04-SM-82-0.0/2.7 | COLD PLANE PAVEMENT AND OVERLAY WITH BONDED WEARING COURSE. | SAN MATEO COUNTY IN MENLO PARK AND ATHERTON ON ROUTE 82 FROM SAN MATEO COUNTY LINE TO BERKSHIRE AVENUE | 05/14/2013 | 1 (05/14/2012) | Details Personnel CEM-3701 Report |