Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13651-13660 of 17829 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214909 | Project ID: 214909 DEA: 120N8604 EFIS: 1214000123 | 12-ORA-73-23.7/24.1 | REPLACE STRUCTURAL CONCRETE BRIDGE & RETAINING WALL; & PLACE HMA. | ORANGE COUNTY IN NEWPORT BEACH FROM 0.3 MILE NORTH OF BISON AVENUE TO 0.3 MILE SOUTH OF UNIVERSITY DRIVE | 01/09/2023 | 1 (07/21/2020) | Details CEM-3701 Report |
214282 | Project ID: 214282 DEA: 120N9304 EFIS: 1215000009 | 12-ORA-1-20.5/20.9 | DRAINAGE SYSTEM RESTORATION. | ORANGE COUNTY IN NEWPORT BEACH FROM 0.7 MILE NORTH OF SR 55/SR 1 SEPARATION TO 0.7 MILE SOUTH OF SANTA ANA RIVER | 06/25/2020 | 1 (10/25/2019) | Details CEM-3701 Report |
994147 | Project ID: 994147 DEA: 120R4104 EFIS: 1218000090 | 12-ORA-1-17.4/21.5 | COLD PLANE AC AND PLACE RHMA-G. | ORANGE COUNTY IN NEWPORT BEACH FROM JAMBOREE ROAD TO SANTA ANA RIVER BRIDGE | 1 (06/28/2023) | Details CEM-3701 Report | |
215029 | Project ID: 215029 DEA: 120Q8504 EFIS: 1217000116 | 12-ORA-5-34.5/37.4 | PLACE POLYESTER CONCRETE ON 3 BRIDGES & REPLACE CONCRETE BARRIERS. | ORANGE COUNTY IN ORANGE AND ANAHEIM FROM 0.1 MILE NORTH OF SANTA ANA RIVER BRIDGE TO HARBOR BOULEVARD OVERCROSSING | 07/08/2022 | 1 (09/01/2020) | Details CEM-3701 Report |
6681 | Project ID: 6681 DEA: 120J1704 | 12-ORA-5-35.1 / 36.3 | MODIFY TRAFFIC SIGNALS AND INSTALL SIGNS | ORANGE COUNTY IN ORANGE AND ANAHEIM FROM 0.1 MILE SOUTH OF STATE COLLEGE BOULEVARD OC TO 0.1 MILE SOUTH OF KATELLA AVENUE OC | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
215458 | Project ID: 215458 DEA: 120P9004 EFIS: 1216000046 | 12-ORA-5-34.5/36.8 | INSTALL ROCK BLANKET, CONCRETE GRID UNITS AND IRRIGATION FACILITIES. | ORANGE COUNTY IN ORANGE AND ANAHEIM FROM SANTA ANA RIVER BRIDGE TO 0.2 MILE NORTH OF ANAHEIM BOULEVARD UNDERCROSSING | 03/03/2023 | 1 (02/22/2021) | Details CEM-3701 Report |
995527 | Project ID: 995527 DEA: 120S3304 EFIS: 1220000043 | 12-ORA-57-11.0/R22.6 | MODIFY LIGHTING AND REPLACE PAVEMENT DELINEATION. | ORANGE COUNTY IN ORANGE AND BREA FROM 0.2 MILE SOUTH OF CHAPMAN AVENUE UNDERCROSSING TO ORANGE COUNTY LINE. | 1 (01/26/2024) | Details CEM-3701 Report | |
994080 | Project ID: 994080 DEA: 120R1504 EFIS: 1218000049 | 12-ORA-55-13.7 | MODIFY TRAFFIC SIGNAL, ADD LIGHTING & REPLACE TRAFFIC STRIPE. | ORANGE COUNTY IN ORANGE AT CHAPMAN AVENUE UNDERCROSSING | 08/15/2024 | 1 (10/31/2022) | Details CEM-3701 Report |
213311 | Project ID: 213311 DEA: 120Q4604 EFIS: 1217000047 | 12-ORA-55-17.0 | PROPOSE PARK AND RIDE LOT FOR TOTAL OF 182 SPACES INCLUDING HC. | ORANGE COUNTY IN ORANGE AT LINCOLN AVENUE UNDERCROSSING | 01/04/2021 | 1 (01/28/2019) | Details CEM-3701 Report |
7743 | Project ID: 7743 DEA: 120M0004 EFIS: 1200020261 | 12-ORA-55-12.7 | OVER LAY HMA(OPEN GRADE), MBGR AND DRAINAGE | ORANGE COUNTY IN ORANGE AT ROUTE 22/55 SEPARATION | 08/22/2013 | 1 (10/29/2012) | Details CEM-3701 Report |