Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13631-13640 of 17373 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210289Project ID: 210289
DEA: 080E9504
Permit Numbers: 0814NMC0370 08156DP0455 0815NRT0491
08-RIV-15-19.45/19.71Enter onto Interstate 15 right-of-way just north of Railroad Canyon Road Interchange in the City of Lake Elsinore to remove existing PCCP and AC shoulder and to construct a new southbound JPCP deceleration lane and HMA shoulder, including minor grading, drainage inlet modification, temporary waterRailroad Canyon Road, Lake Elsinore07/31/20182 (08/04/2015)Details CEM-3701 Report
1624Project ID: 1624
DEA: 040A8604
EFIS: 0400000173
04-SM-101-15.64BELMONT BIKEWAY PROJECT: AT-GRADE BIKE PATH, RETAINING WALLS, SOUTH AND NORTH APPROACH RAMP STRUCTURES.RALSTON AVENUE BIKEWAY OC AND O'NEILL SLOUGH PEDESTRIAN BRIDGE04/29/20112 (09/02/2014)Details CEM-3701 Report
7511Project ID: 7511
EFIS: 0000001155
Permit Numbers: 0812NMC0482 0813NDP0006 0814ART0189 0814ART0190
08-SBD-15-29.5/30.9Enter onto Interstate 15 (I-15) right of way at Ranchero Road in the City of Hesperia, San Bernardino County, to construct new I-15/Ranchero Road interchange including approx. 1300 foot auxiliary lane prior to N/B off ramp, and approx. 3200 foot auxiliary lane from S/B loop on ramp, street improvemRanchero Road, Hesperia07/31/2018NOT VERIFIEDDetails CEM-3701 Report
6458Project ID: 6458
EFIS: 0000001155
Permit Numbers: 1208NMC0193
12-ORA-5-10.749/11.069A-perform street widening on Junipero Serra to include paving, curb & gutter and storm drain modifications to accommodate relocation of street catch basin. B- construct sidewalk & landscape between the existing â ³ Park & Rideâ ³ facilities and JuRancho Viejo Road, San Juan Capistrano09/08/2016NOT VERIFIEDDetails CEM-3701 Report
208568Project ID: 208568
DEA: 03372804
EFIS: 0300000428
Permit Numbers: 0312NMC0382
03-ED-50-15.6/17Construct Phase 1A - Interchange ImprovementRay Lawyer Dr WB on Ramp to US 50 and Fair Lane Road12/08/20172 (03/01/2013)Details CEM-3701 Report
3933Project ID: 3933
DEA: 071X9104
07-LA-1-53.9REBUILD SLOPES AND DRAINAGE SYSTEMREBUILD (2) ROADBED SUPPORT SLOPES ANDDRAINAGE SYSTEMS WASHED OUT BY STORMRUNOFFDIR'S EMERGENCY F.A. CONTRACT08/19/20101 (08/18/2010)Details CEM-3701 Report
6116Project ID: 6116
DEA: 11272504
11-SD-94-3.3REBUILD CONCRETE CHANNELRebuild Concrete Channel at Cholas Creek Bridge.08/02/20101 (08/02/2010)Details CEM-3701 Report
973Project ID: 973
DEA: 031M4404
03-COL-20-30.6CONCRETE SIDEWALKRECONSTRUCT PORTIONS OF CONCRETE SIDEWALK IN THE CITY OF COLUSA ALONG ROUTE 20 FROM FREMONT STREET TO BRIDGE STREET12/08/20171 (11/21/2014)Details CEM-3701 Report
210641Project ID: 210641
DEA: 021E9704
EFIS: 0200000146
02-TEH-5-R24.3/R25.4SB ON & OFF Ramp Construction- Modify IntersectionRed Bluff 1 (07/22/2015)Details CEM-3701 Report
211250Project ID: 211250
DEA: 010B6014
EFIS: 0116000017
MINOR: 01A1650
01-HUM-101-39.6Modify LightingRedcrest12/21/20201 (08/24/2016)Details CEM-3701 Report