Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13591-13600 of 17201 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
8053Project ID: 8053
DEA: 080C2104
08-RIV-62-85.0REPLACE CULVERTSRIVERSIDE COUNTY ABOUT 27 MILES NORTH OF DESERT CENTER AT 0.1 MILE EAST OF ROUTE 62/177 SEPARATION04/03/20131 (12/10/2012)Details CEM-3701 Report
210837Project ID: 210837
DEA: 080J0804
EFIS: 0800000283
COOP: 081625
08-RIV-15-34.7/51.6(Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECTRiverside County and SBD-15-0.0/1.3 1 (05/08/2017)Details CEM-3701 Report
212447Project ID: 212447
DEA: 081E9714
08-RIV-62-0.1,7.5/9.2INSTALL MGS AND REPLACE TERMINAL SYSTEM END TREATMENTSRIVERSIDE COUNTY AT 0.1 MILE NORTH OF ROUTE 10 AND FROM 0.6 MILE EAST OF NORTH INDIAN CANYON DRIVE TO SAN BERNARDINO COUNTY LINE08/16/20231 (06/24/2021)Details CEM-3701 Report
210416Project ID: 210416
DEA: 081C1104
08-RIV-371-56/61.9,72.9/77.2RUBBERIZED HOT MIX ASPHALT GAP GRADED AND LOCALIZED DIG-OUTRIVERSIDE COUNTY AT AGUANGA FROM ROUTE 79 TO 0.78 MILE WEST OF BRADFORD ROAD AND AT ANZA FROM 0.08 MILE EAST OF KIRBY ROAD TO ROUTE 7407/05/20231 (10/15/2015)Details CEM-3701 Report
5286Project ID: 5286
DEA: 08459004
08-RIV-74-64.7/69.0REMOVE HEADWALLS, EXTEND CULVERTS AND INSTALL MBGRRIVERSIDE COUNTY AT AND NEAR PINE MEADOW AT VARIOUS LOCATION FROM THOMAS MOUNTAIN ROAD TO TOOL BOX SPRING ROAD06/08/20121 (06/08/2012)Details CEM-3701 Report
5092Project ID: 5092
DEA: 080M4904
08-RIV-74-68/92INSTALL CENTERLINE RUMBLE STRIPRIVERSIDE COUNTY AT GARNER VALLEY AND PINYON PINE FROM BARBARA LEE DR. TO 1.4 MILES WEST OF CAHUILLA WAY10/10/20111 (01/05/2012)Details CEM-3701 Report
5082Project ID: 5082
DEA: 080M1404
08-RIV-60-R4.0,R4.9Remove CMS sign structure and install CMS sign structure with MVPRIVERSIDE COUNTY AT GLEN AVON AT 0.4 MILES WEST OF PEDLEY ROAD OVERCROSSING AT 0.4 MILES EAST OF PEDLEY ROAD OVERCROSSING06/13/20111 (04/19/2010)Details CEM-3701 Report
5205Project ID: 5205
DEA: 081A3604
08-RIV-60-2.9Widen rampRIVERSIDE COUNTY AT GLEN AVON AT COUNTRY VILLAGE ROAD EASTBOUND EXIT RAMP12/20/20101 (12/20/2010)Details CEM-3701 Report
208669Project ID: 208669
DEA: 081C1204
08-RIV-78-0.0/6.0,10.6/10.9COLD PLANE AND HMA OVERLAY WITH DIGOUTSRIVERSIDE COUNTY AT RIPLEY FROM RIVERSIDE COUNTY LINE TO 0.3 MILE SOUTH OF 28TH AVENUE AND FROM 0.3 MILE SOUTH OF 24TH AVENUE TO 24TH AVENUE09/24/20131 (06/10/2013)Details CEM-3701 Report
7174Project ID: 7174
DEA: 080P9404
08-RIV-111-0.0/6.0,56.2/R63.3COLD PLANE AND OVERLAY WITH RHMA-G AND LOCAL DIG-OUTSRIVERSIDE COUNTY AT SALTON AND IN PALM SPRINGS FROM RIVERSIDE-IMPERIAL COUNTY LINE TO MECCA BEACH CAMP ROAD AND FROM CHINO CREEK BRIDGE TO ROUTE 111/10 SEPARATION11/13/2012NOT VERIFIEDDetails CEM-3701 Report