Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13591-13600 of 17201 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
8053 | Project ID: 8053 DEA: 080C2104 | 08-RIV-62-85.0 | REPLACE CULVERTS | RIVERSIDE COUNTY ABOUT 27 MILES NORTH OF DESERT CENTER AT 0.1 MILE EAST OF ROUTE 62/177 SEPARATION | 04/03/2013 | 1 (12/10/2012) | Details CEM-3701 Report |
210837 | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 | 08-RIV-15-34.7/51.6 | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT | Riverside County and SBD-15-0.0/1.3 | 1 (05/08/2017) | Details CEM-3701 Report | |
212447 | Project ID: 212447 DEA: 081E9714 | 08-RIV-62-0.1,7.5/9.2 | INSTALL MGS AND REPLACE TERMINAL SYSTEM END TREATMENTS | RIVERSIDE COUNTY AT 0.1 MILE NORTH OF ROUTE 10 AND FROM 0.6 MILE EAST OF NORTH INDIAN CANYON DRIVE TO SAN BERNARDINO COUNTY LINE | 08/16/2023 | 1 (06/24/2021) | Details CEM-3701 Report |
210416 | Project ID: 210416 DEA: 081C1104 | 08-RIV-371-56/61.9,72.9/77.2 | RUBBERIZED HOT MIX ASPHALT GAP GRADED AND LOCALIZED DIG-OUT | RIVERSIDE COUNTY AT AGUANGA FROM ROUTE 79 TO 0.78 MILE WEST OF BRADFORD ROAD AND AT ANZA FROM 0.08 MILE EAST OF KIRBY ROAD TO ROUTE 74 | 07/05/2023 | 1 (10/15/2015) | Details CEM-3701 Report |
5286 | Project ID: 5286 DEA: 08459004 | 08-RIV-74-64.7/69.0 | REMOVE HEADWALLS, EXTEND CULVERTS AND INSTALL MBGR | RIVERSIDE COUNTY AT AND NEAR PINE MEADOW AT VARIOUS LOCATION FROM THOMAS MOUNTAIN ROAD TO TOOL BOX SPRING ROAD | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
5092 | Project ID: 5092 DEA: 080M4904 | 08-RIV-74-68/92 | INSTALL CENTERLINE RUMBLE STRIP | RIVERSIDE COUNTY AT GARNER VALLEY AND PINYON PINE FROM BARBARA LEE DR. TO 1.4 MILES WEST OF CAHUILLA WAY | 10/10/2011 | 1 (01/05/2012) | Details CEM-3701 Report |
5082 | Project ID: 5082 DEA: 080M1404 | 08-RIV-60-R4.0,R4.9 | Remove CMS sign structure and install CMS sign structure with MVP | RIVERSIDE COUNTY AT GLEN AVON AT 0.4 MILES WEST OF PEDLEY ROAD OVERCROSSING AT 0.4 MILES EAST OF PEDLEY ROAD OVERCROSSING | 06/13/2011 | 1 (04/19/2010) | Details CEM-3701 Report |
5205 | Project ID: 5205 DEA: 081A3604 | 08-RIV-60-2.9 | Widen ramp | RIVERSIDE COUNTY AT GLEN AVON AT COUNTRY VILLAGE ROAD EASTBOUND EXIT RAMP | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
208669 | Project ID: 208669 DEA: 081C1204 | 08-RIV-78-0.0/6.0,10.6/10.9 | COLD PLANE AND HMA OVERLAY WITH DIGOUTS | RIVERSIDE COUNTY AT RIPLEY FROM RIVERSIDE COUNTY LINE TO 0.3 MILE SOUTH OF 28TH AVENUE AND FROM 0.3 MILE SOUTH OF 24TH AVENUE TO 24TH AVENUE | 09/24/2013 | 1 (06/10/2013) | Details CEM-3701 Report |
7174 | Project ID: 7174 DEA: 080P9404 | 08-RIV-111-0.0/6.0,56.2/R63.3 | COLD PLANE AND OVERLAY WITH RHMA-G AND LOCAL DIG-OUTS | RIVERSIDE COUNTY AT SALTON AND IN PALM SPRINGS FROM RIVERSIDE-IMPERIAL COUNTY LINE TO MECCA BEACH CAMP ROAD AND FROM CHINO CREEK BRIDGE TO ROUTE 111/10 SEPARATION | 11/13/2012 | NOT VERIFIED | Details CEM-3701 Report |