Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13551-13560 of 17277 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1832 | Project ID: 1832 DEA: 04163744 EFIS: 0400000438 | 04-SF-101-04-SF-101-8.2/9.2 | DOYLE DRIVE REHABILITATION Phase 1 - Contract 4 | Presidio Parkway | 06/24/2013 | 1 (11/05/2012) | Details CEM-3701 Report |
211850 | Project ID: 211850 Permit Numbers: 05166DP0551 0515NSN0490 | 05-SLO-227--1/-1 | Signal pole relocation at the intersection of Price Canyon Road and SR 227 is required due to the widening of Price Canyon. Plans have been submitted, reviewed and accepted by Caltrans Traffic Engineering - once with prior encroachment permit submittal, and again with recent revisions to 2010 Stand | Price Street and State Highway 101, SLO County | 09/06/2019 | 1 (09/06/2016) | Details CEM-3701 Report |
212594 | Project ID: 212594 DEA: 00000001 | --- | CMTB Special Projects - Carbon Sequestered Aggregate Testing (Blue Planet) | Project created as a tracking page for status updates, info sharing, etc. | NOT VERIFIED | Details CEM-3701 Report | |
208836 | Project ID: 208836 DEA: 08355561 EFIS: 0800000621 | 08--- | PS&E is scheduled for early December, in house design with CT-AAA | Project is added so results of Translab tests can be entered in J2. | 1 (05/02/2013) | Details CEM-3701 Report | |
210489 | Project ID: 210489 DEA: 080F6314 EFIS: 0813000220 | 08-SBD-395-11.2/16.6 | The scope of project is widening approximately 5 miles of US 395 from two lanes to four lanes, repave existing lanes, modify five signals, upgrade ADA access, add turn lanes, add sound walls, and extend bridge | Project Limits are PM 11.2 from 16.6 and US 395. | 08/19/2021 | 2 (01/03/2019) | Details CEM-3701 Report |
215462 | Project ID: 215462 DEA: 080C8704 EFIS: 0800000064 COOP: 081687 | 08-SBD-SR 60-R2.08/2.80 | The project scope of work is widening approximately .7 miles of SR-60 at Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions | Project Limits are SR-60 from 0.3 miles west to 0.4 miles east of Central Ave. PM 2.08/2.80 in Chino. | 2 (01/18/2021) | Details CEM-3701 Report | |
888 | Project ID: 888 EFIS: 0000001155 Permit Numbers: 0310NMC0697 | 03-SUT-99-31.18/31.45 | Widen Off-ramp at Queens Avenue | Queens Avenue, Yuba City | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
895 | Project ID: 895 EFIS: 0000001155 Permit Numbers: 0311NRD0131 | 03-SUT-99-31.18/31.45 | Widen Off-ramp at Queens Avenue | Queens Avenue, Yuba City | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
214131 | Project ID: 214131 DEA: 080N69U4 EFIS: 0812000307 COOP: 081635 | 08-RIV-60-22.1/22.6 | Improving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages. | R-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively. | 2 (04/30/2019) | Details CEM-3701 Report | |
2185 | Project ID: 2185 DEA: 042L0304 | 04-ALA-580-R5.8 | CONSTRUCT CONCRETE BARRIER AND THRIE BEAM BARRIER | R5.8 Alameda County near Livermore | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |