Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13501-13510 of 17277 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213494 | Project ID: 213494 DEA: 020H4504 EFIS: 0215000017 | 02-PLU-70-11.5/11.9 | REALIGN CURVE, WIDEN & PAVE SHOULDER, ADD GUARDRAIL & GABION WALL. | PLUMAS COUNTY ABOUT 3 MILES WEST OF BELDEN FROM 2.1 MILES TO 1.6 MILES WEST OF CHIPPS CREEK BRIDGE | 12/04/2019 | 1 (08/10/2018) | Details CEM-3701 Report |
210297 | Project ID: 210297 DEA: 024F3904 EFIS: 0212000102 | 02-PLU-147-7.5/8.9 | PULVERIZE PAVEMENT AND HOT MIX ASPHALT OVERLAY | PLUMAS COUNTY ABOUT 7 MILES NORTH OF CANYON DAM FROM 0.1 MILE NORTH OF COUNTY ROAD A-13 TO HAMILTON BRANCH BRIDGE | 08/03/2018 | 1 (09/23/2015) | Details CEM-3701 Report |
211226 | Project ID: 211226 DEA: 024E6404 EFIS: 0212000011 | 02-PLU-147-8.9/9.3 | REPLACE BRIDGE, GUARDRAILING, HMA, STRIPING | PLUMAS COUNTY ABOUT 9 MILES NORTH OF CANYON DAM FROM 0.1 MILE SOUTH TO 0.4 MILE NORTH OF HAMILTON BRANCH BRIDGE | 11/12/2020 | 1 (04/21/2016) | Details CEM-3701 Report |
215482 | Project ID: 215482 DEA: 021J5004 EFIS: 0220000085 | 02-PLU-70-10.0/25.0 | RHMA OVERLAY, REPLACE AC SURFACING, GUARDRAIL AND SHOULDER BACKING. | PLUMAS COUNTY AT AND NEAR BELDEN FROM 1.0 MILE EAST OF CHAMBERS CREEK BRIDGE TO 0.7 MILE EAST OF VIRGILIA ROAD | 08/11/2023 | 1 (03/08/2021) | Details CEM-3701 Report |
994539 | Project ID: 994539 DEA: 021H58U4 EFIS: 0223000059 | 02-PLU-70-58.2/R78.4 | RECONSTRUCT ROADWAY, HMA PAVING, DRAINAGE AND ELECTRICAL WORK. | PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE | 1 (05/08/2023) | Details CEM-3701 Report | |
643 | Project ID: 643 DEA: 023C5104 | 02-PLU-89-3.9/7.8 | REPLACE CULVERTS | Plumas County at and near Graegle from 0.5 mile North of Guest Ranch Road to County Road A-14. | 12/30/2009 | 1 (12/30/2009) | Details CEM-3701 Report |
214571 | Project ID: 214571 DEA: 020J1104 EFIS: 0219000062 | 02-PLU-70-33.1/42.1 | PLACE HMA & SHOULDER BACKING, & REMOVE & REPLACE PAVEMENT DELINEATION. | PLUMAS COUNTY AT AND NEAR KEDDIE FROM INDIAN CREEK BRIDGE TO 0.3 MILE WEST OF SPANISH CREEK BRIDGE NO. 09-0018 | 04/27/2021 | 1 (01/22/2020) | Details CEM-3701 Report |
215483 | Project ID: 215483 DEA: 022J0004 EFIS: 0221000017 | 02-PLU-49-0.0/7.5 | PLACE HOT MIX ASPHALT (TYPE A). | PLUMAS COUNTY AT AND NEAR VINTON FROM SIERRA COUNTY LINE TO ROUTE 70 | 11/24/2021 | 1 (03/08/2021) | Details CEM-3701 Report |
488 | Project ID: 488 DEA: 021E8904 | 02-PLU-70-R66.4/71.5 | Thin Blanket Overlay with Dig outs | PLUMAS COUNTY AT BLAIRSDEN FROM 0.3 MILE WEST TO 4.9 MILES EAST OF ROUTE 89 | 03/11/2011 | 1 (02/15/2010) | Details CEM-3701 Report |
7280 | Project ID: 7280 DEA: 025E2104 EFIS: 0212000094 | 02-PLU-36-6.5/9.2 | COLD IN-PLACE RECYCLE WITH HMA OVERLAY | PLUMAS COUNTY AT CHESTER FROM 0.2 MILE EAST OF ROUTE 89 TO MELISSA AVENUE | 07/22/2013 | 1 (10/11/2012) | Details CEM-3701 Report |