Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13281-13290 of 17291 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
210510 | Project ID: 210510 DEA: 120H8904 | 12-ORA-55,5-9.6/12.0,29.6/31.1 | ROADSIDE SAFETY IMPROVEMENT | ORANGE COUNTY IN SANTA ANA AND TUSTIN ON ROUTE 55 FROM MCFADDEN AVENUE TO 17TH STREET AND ON ROUTE 5 FROM NEWPORT AVENUE TO 4TH STREET | 05/10/2016 | 1 (06/29/2021) | Details CEM-3701 Report |
6513 | Project ID: 6513 DEA: 120E2504 | 12-ORA-55-7.0/7.9 | Widen freeway. | ORANGE COUNTY IN SANTA ANA FROM 0.1 MILE NORTH OF MACARTHUR BOULEVARD UNDERCROSSING TO 0.2 MILE SOUTH OF DYER ROAD UNDERCROSSING | 12/02/2011 | 1 (12/02/2011) | Details CEM-3701 Report |
211905 | Project ID: 211905 DEA: 120N2804 EFIS: 1213000191 | 12-ORA-5-33.6/34.1 | GRIND & GROOVE CONC PVMT, HMA PAVING, SLAB REPLACEMENT & LIGHTING | ORANGE COUNTY IN SANTA ANA FROM 0.4 MILE SOUTH TO 0.1 MILE NORTH OF ROUTE 22/5 SEPARATION | 10/16/2017 | 1 (04/24/2017) | Details CEM-3701 Report |
214195 | Project ID: 214195 DEA: 120N5104 | 12-ORA-5-31.0/33.3 | CONSTRUCT MINOR CONCRETE AND INSTALL IRRIGATION SYSTEMS AND PLANTING. | ORANGE COUNTY IN SANTA ANA FROM FOURTH STREET OVERCROSSING TO BROADWAY OVERCROSSING | 01/18/2022 | 1 (09/12/2019) | Details CEM-3701 Report |
213615 | Project ID: 213615 DEA: 120N5004 | 12-ORA-22,55-R11.7/R13.2,12.0/13.4 | CONST SLOPE PAVING, MINOR CONC IN NARROW AREAS, MAINT ACCESS ROADS | ORANGE COUNTY IN SANTA ANA, AND TUSTIN ON ROUTE 55 FROM 0.3 MILE SOUTH OF 17TH STREET TO 0.06 MILE SOUTH OF SANTIAGO CREEK AND ON ROUTE 22 FROM ROUTE 55 TO 0.03 MILE WEST OF SANTIAGO CREEK | 02/19/2020 | 1 (09/10/2018) | Details CEM-3701 Report |
6787 | Project ID: 6787 DEA: 120L1104 | 12-ORA-5-31.4/42.5 | REMOVE AND REPLACE PAVEMENT DELINEATION | ORANGE COUNTY IN SANTA ANA, ORANGE, FULLERTON, ANAHEIM, AND BUENA PARK FROM 0.4 MILE SOUTH OF GRAND AVENUE UNDERCROSSING TO 0.6 MILE NORTH OF MAGNOLIA AVENUE OVERCROSSING | 12/19/2011 | 1 (12/19/2011) | Details CEM-3701 Report |
6766 | Project ID: 6766 DEA: 120K5504 | 12-ORA-22-R0.4 | OVERLAY BRIDGE DECK WITH POLYESTER CONCRETE | ORANGE COUNTY IN SEAL BEACH AT EASTBOUND 22 NORTHBOUND 605 AND NORTHBOUND 405/22 CONNECTOR SEPARATION | 07/08/2011 | 1 (07/08/2011) | Details CEM-3701 Report |
6706 | Project ID: 6706 DEA: 120J5704 | 12-ORA-405-22.7 | AC Overlay (Open Graded) on the Off Ramp | ORANGE COUNTY IN SEAL BEACH AT SOUTHBOUND SEAL BEACH BOULEVARD OFF-RAMP | 10/25/2010 | 1 (03/15/2011) | Details CEM-3701 Report |
6429 | Project ID: 6429 DEA: 12071634 EFIS: 1200000037 COOP: 610A1 | 12-ORA-22,405,605-R0.3/R0.9,22.3/24.0,3.0/R1.6 | RECONSTRUCT INTERCHANGE WITH 6 BRIDGES AND 10 RETAINING WALLS | ORANGE COUNTY IN SEAL BEACH, LONG BEACH, AND LOS ALAMITOS ON ROUTE 22 FROM 22-605 SEPARATION TO 22-405 SEPARATION, ON ROUTE 405 FROM 0.4 MILE EAST OF SEAL BEACH BOULEVARD OVERCROSSING TO 605-405 SEPARATION, AND ON ROUTE 605 FROM 0.2 MILE SOUTH OF 405-605 | 05/11/2015 | 1 (02/21/2012) | Details CEM-3701 Report |
215459 | Project ID: 215459 DEA: 120Q6404 EFIS: 1217000080 | 12-ORA-39-9.7 | MODIFY SIGNAL AND LIGHTING SYSTEMS. | ORANGE COUNTY IN STANTON AT CHAPMAN AVENUE | 12/29/2022 | 1 (02/22/2021) | Details CEM-3701 Report |