Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13161-13170 of 18258 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213577 | Project ID: 213577 DEA: 56930713 EFIS: 0016000324 MINOR: 02A1726 | 56-SHA-- | Brine Tank Project- Installation of Salt Brine Making System and relocation of storage tank. | Mount Shasta Maintenance Station 1625 Mott Road MT Shasta, CA 96067 | 08/11/2023 | 1 (09/04/2018) | Details CEM-3701 Report |
215576 | Project ID: 215576 DEA: 051K1304 EFIS: 0518000126 | 05-SCR-9-20.0 | Soldier pile wall | MP 20, 1.1 miles South of junction Rte 9 and Rte 236 | 07/31/2024 | 1 (04/07/2022) | Details CEM-3701 Report |
213260 | Project ID: 213260 DEA: 101J6604 | 10-MPA,MPA/STA/TUO-132-9.6/39.0/5.5 | Road washout repair | MPA/STA/TUO Counties | 01/05/2023 | 1 (08/27/2018) | Details CEM-3701 Report |
993767 | Project ID: 993767 DEA: 101N6104 EFIS: 1022000002 | 10-STA-99-17.9/18.7, 3.1/3.3, 6.3/6.5, 11.5/11.7, 14/14.1, 15.6/16.1 | SLOPE PAVING, BRIDGE AND SECURITY, VEGETATION REMOVAL OR PRUNING DIRS EFA 10A2400. SLOPE PAVE, FENCING, VEG REMOVAL AND PRUNE | MULTIPLE LOCATIONS ON 99 IN STANISLAUS COUNTY | 06/26/2023 | 1 (06/08/2022) | Details CEM-3701 Report |
211051 | Project ID: 211051 DEA: 010B6004 EFIS: 0112000163 MINOR: 01A1602 | 01-HUM-101-28.0 | Modify Lighting | Myers Flat | 12/21/2020 | 1 (03/29/2016) | Details CEM-3701 Report |
214261 | Project ID: 214261 DEA: 06484604 EFIS: 0600000484 COOP: 061726 | 06--,99- | The bridge work includes construction of ten (10) new bridges as part of the future SR-58 Centennial Corridor. This work includes constructing one (1) Viaduct, four (4) Undercrossings, three (3) Overcrossings, and two (2) Connector Overcrossings. In addit | n Kern County in Bakersfield on Route 58 from 0.1 miles west of Mohawk St to Cottonwood Rd and on Route 99 from 0.8 miles south of Route 58 to 0.3 Miles north of Route 58 | 2 (08/05/2019) | Details CEM-3701 Report | |
1787 | Project ID: 1787 EFIS: 0000001155 Permit Numbers: 04116DP0269 | 04-NAP-12-24/24 | Road widening; install guardrail and PG&E substructures for pole relocation; traffic signal and loop relocation. | N. Kelly Road, Napa | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
995044 | Project ID: 995044 Permit Numbers: 0820NSN0696 0822NRT0583 0822NRT1098 | 08---48.872/54.951 | Enter onto State Route 111 right of way at N. Palm Canyon Drive, Vista Chino, Gene Autry Trail in Palm Springs to modify six signalized intersections and the installation of new conduits, pull boxes, wireless communications, video detection, traffic signal cabinets, controllers, signal poles and fo | N. Palm Canyon Dr. Vista Chino (VC), Gene Autry Trail, Palm Springs | 1 (08/02/2023) | Details CEM-3701 Report | |
212437 | Project ID: 212437 Permit Numbers: 0515NMC0336 05176DP0325 0517NRT0310 | 05-SB-166-7.4/7.4 | Remove and replace existing striping at N.Depot St. and Main St. to accommodate new left-turn lane and shared through/right lane; adjust signal phasing accordingly; stripe new bike lanes; install new traffic detector loops on N. Depot St.; install new 30ft mast arm and left arrow indication on exis | N.Depot St., Santa Maria | 10/29/2020 | 1 (07/05/2017) | Details CEM-3701 Report |
724 | Project ID: 724 Permit Numbers: 03026RP0326 | 03-PLA-267-3.9/4.5 | ROAD APPROACH | N/A, N/A | 09/16/2014 | 2 (09/15/2014) | Details CEM-3701 Report |