Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 221-230 of 17830 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212308 | Project ID: 212308 DEA: 051C6604 EFIS: 0512000186 | 05-MON-198-22.4/22.8 | WIDEN SHOULDER, RECONSTRUCT ROADWAY AND RESURFACE PAVEMENT WITH HMA. | MONTEREY COUNTY ABOUT 22 MILES EAST OF SAN LUCAS FROM 0.1 MILE WEST TO 0.3 MILE EAST OF NORTH FORK ROAD | 08/14/2018 | 1 (04/26/2017) | Details CEM-3701 Report |
210622 | Project ID: 210622 DEA: 051A8704 EFIS: 0512000034 | 05-SCR-1,17-17.0,0.0 | WIDEN SHOULDER, COLD PLANE PAVEMENT AND OVERLAY WITH HMA. | SANTA CRUZ COUNTY IN SANTA CRUZ AT ROUTE 1/17 SEPARATION | 06/29/2016 | 1 (10/23/2015) | Details CEM-3701 Report |
5619 | Project ID: 5619 DEA: 100M2301 MINOR: 10A1020 | 10-TUO-49-3.68 | WIDEN SHOULDER SB LANERTE 49 TO INSTALL SLOW VEHICLE TURNOUT | 04/17/2011 | NOT VERIFIED | Details CEM-3701 Report | |
2326 | Project ID: 2326 DEA: 04444214 | 04-NAP-121-0.5/2.3 | WIDEN SHOULDER REALIGN | Napa County on route 121 from 0.5 KM North of Sonoma County Line to 0.2 KM East of Duhig Road. | 02/03/2011 | 1 (01/14/2011) | Details CEM-3701 Report |
210111 | Project ID: 210111 DEA: 031F4204 EFIS: 0300001119 | 03-BUT-99-40.5/40.8 | WIDEN SHOULDER ON STRUCTURE. | BUTTE COUNTY NEAR CHICO FROM 0.2 MILE SOUTH TO 0.1 MILE NORTH OF ROCK CREEK BRIDGE | 11/30/2017 | 1 (01/02/2015) | Details CEM-3701 Report |
444 | Project ID: 444 DEA: 021C9904 | 02-SHA-44-51.2 | WIDEN SHOULDER AT ESKIMO HILL | IN SHASTA COUNTY ABOUT 13 KM EAST OF VIOLA FROM 0.1 KM TO 1.1 KMEAST OF BRIDGE CREEK ROAD | 12/23/2010 | 1 (11/17/2006) | Details CEM-3701 Report |
141 | Project ID: 141 DEA: 01458504 | 01-MEN-101-R39.7/R142.0 | Widen shoulder and upgrade metal beam guard railing | 11/19/2010 | 1 (04/19/2007) | Details CEM-3701 Report | |
3394 | Project ID: 3394 DEA: 06322104 | 06-KER-166-14.5/39.6 | WIDEN SHOULDER AND RESURFACE ROADWAY W/ RUBBERIZED HOT MIX | 12/13/2012 | 1 (01/12/2011) | Details CEM-3701 Report | |
5376 | Project ID: 5376 DEA: 09326404 | 09-MNO-158-0.0/1.7 | WIDEN SHOULDER AND RESURFACE PAVEMENT WITH HOT MIX ASPHALT | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
208953 | Project ID: 208953 DEA: 060H1704 EFIS: 0600000118 | 06-FRE-180-77.2 | WIDEN SHOULDER AND REPLACE BRIDGE. | FRESNO COUNTY NEAR FRESNO AT KINGS RIVER OVERFLOW BRIDGE | 12/08/2020 | 1 (10/08/2014) | Details CEM-3701 Report |