Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 171-180 of 17757 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
792 | Project ID: 792 DEA: 030F2004 Permit Numbers: 0309NSN0188 | 03-SAC-5-11.11/11.82 | MINOR NB MID RAMP WIDENING AND RAMP METER MODIFICATION AT NB ELK GROVE BLVD ON I-5 | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report | |
793 | Project ID: 793 Permit Numbers: 0309NSN0310 | 03-SAC-51-1.26 | J STREET TWO-WAY CONVERSION SIGNAL MODIFICATION AND STRIPING | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report | |
794 | Project ID: 794 EFIS: 0000001155 Permit Numbers: 0309NSN0561 | 03-YOL-50-2.92/2.92 | reconstruction of Hwy 50 S river rd off-ramp for "bridge "district" Phase I public roadway/redevelopement project. existing grades at the street intersection will be raised and the number of travel lanes increased, requiring the reconstrcution of the off-ramp up to the bridge abutemen | 111 Tower Street, West Sacramento | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
795 | Project ID: 795 Permit Numbers: 0309NSN0737 0309NRD0993 | 03-SAC-50-15.81/15.812 | U.S. 50 on ramp (WB) will be widened approximately three feet to the east. The existing pavement on Hazel Avenue will be overlaid with 2" ARHM-GG. The maximum excavation depth (30.5") will occur on the SW shoulder between station 59+33.28 to 63+42.64. Along with the widening, curb, gutter | Hazel, Sacramento | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
796 | Project ID: 796 Permit Numbers: 0309NSN0765 | 03-COL-20-30.09/30.09 | New signal, turn lanes, curb, gutter and sidewlk inprovements, landscape and drainage improvementsSPECIAL FUNDED PROJ. W/ COOP | 425 Webster Street, Colusa | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
813 | Project ID: 813 DEA: 030AA034 EFIS: 0300020150 MINOR: 03A1788 | 03-PLA-- | Install a photo voltaic solar panel system at the Auburn Maintenance Station. | Auburn Maintenance Station. | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report |
820 | Project ID: 820 DEA: 030C8904 EFIS: 0300000019 COOP: 030613 | 03-ED-50-11.2 | FOOTHILL OAKS BLVD/US 50 INTERCHANGE PROJECT- SHINGLE SPINGS BAN OF MILWOK INDIANS | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
821 | Project ID: 821 DEA: 030C9704 EFIS: 0300000021 | 03-SAC-275- | WIDEN TOWER BRIDGE SIDEWALKS Br # 22-0021 | 12/08/2017 | 2 (12/05/2014) | Details CEM-3701 Report | |
831 | Project ID: 831 DEA: 030E2604 EFIS: 0300000029 MINOR: 03A1321 | 03-PLA-89-24.5 | REPAIR EMBANKMENT SLOPE | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
837 | Project ID: 837 DEA: 030E5804 MINOR: 03A1094 | 03-COL-- | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report |