Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17251-17260 of 17710 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
210278 | Project ID: 210278 DEA: 060T1804 EFIS: 0615000031 | 06-TUL-99-41.3/52.0 | PLACE RUBBERIZED HMA OPEN GRADED (BWC) ON EXISTING PAVEMENT. | TULARE COUNTY NEAR GOSHEN FROM 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD TO 0.2 MILE NORTH OF DODGE AVENUE OVERCROSSING | 07/31/2017 | 1 (03/23/2015) | Details CEM-3701 Report |
7502 | Project ID: 7502 DEA: 06360214 EFIS: 0600020408 | 06-TUL-99-R37.3/41.3 | WIDENING FREEWAY FROM 4-LANE TO 6-LANE | TULARE COUNTY NEAR GOSHEN FROM 0.9 MILE SOUTH OF WEST VISALIA OVERHEAD TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD | 06/11/2018 | 1 (09/17/2012) | Details CEM-3701 Report |
212803 | Project ID: 212803 DEA: 060T8004 EFIS: 0615000231 | 06-TUL-99-R37.3/41.3 | RESURFACE EXISTING PAVEMENT WITH RHMA-OPEN (BWC). | TULARE COUNTY NEAR GOSHEN FROM 0.9 MILE SOUTH OF WEST VISALIA OVERHEAD TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD | 04/14/2021 | 1 (12/19/2018) | Details CEM-3701 Report |
211367 | Project ID: 211367 DEA: 060T8704 EFIS: 0615000173 | 06-TUL-99-51.3/52.3 | JOINTED PLANE CONCRETE PAVEMENT LANE AND INDIVIDUAL SLAB REPLACEMENT. | TULARE COUNTY NEAR KINGSBURG FROM 0.5 MILE SOUTH OF DODGE AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF KINGS RIVER BRIDGE | 08/03/2018 | 1 (09/21/2016) | Details CEM-3701 Report |
6991 | Project ID: 6991 DEA: 060N3004 | 06-TUL-201-0.0/14.0 | PLACE SLURRY SEAL ON EXISTING PAVEMENT. | TULARE COUNTY NEAR KINGSBURG FROM FRESNO AND TULARE COUNTY LINE TO JUNCTION 63 | 07/24/2012 | 1 (02/13/2012) | Details CEM-3701 Report |
994860 | Project ID: 994860 DEA: 061A5404 EFIS: 0620000062 | 06-TUL-201-0.0/4.9 | INSTALL RUMBLE STRIP, PAVEMENT DELINEATION AND TMS SYSTEM. | TULARE COUNTY NEAR KINGSBURG FROM FRESNO COUNTY LINE TO ROAD 56 | 1 (06/14/2023) | Details CEM-3701 Report | |
3160 | Project ID: 3160 DEA: 060F8004 | 06-TUL-198-L5711 | REMOVE CONTAMINATED MATERIAL AND PLACE BACKFILL MATERIAL. | TULARE COUNTY NEAR LEMON COVE AT THE LEMON COVE MAINTENANCE STATION | 06/01/2012 | 1 (10/17/2011) | Details CEM-3701 Report |
209239 | Project ID: 209239 DEA: 060P3804 EFIS: 0612000151 | 06-TUL-99-9.0/10.6 | SLAB REPLACEMENT WITH RAPID STRENGTH CONCRETE OR HOT MIX ASPHALT. | TULARE COUNTY NEAR PIXLEY FROM 0.7 MILE SOUTH OF AVENUE 76 UNDERCROSSING TO 1.7 MILES SOUTH OF AVENUE 96 OVERCROSSING | 04/24/2018 | 1 (12/19/2014) | Details CEM-3701 Report |
3398 | Project ID: 3398 DEA: 06337404 EFIS: 0600020150 | 06-TUL-190-21.2/26.4 | COLD PLANE AND PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILE EAST OF ROAD 284 TO PLEASANT OAK DRIVE | 07/28/2020 | 1 (03/21/2011) | Details CEM-3701 Report |
7167 | Project ID: 7167 DEA: 06337414 EFIS: 0600020605 | 06-TUL-190-21.2/26.4 | COLD PLANE AND PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILE EAST OF ROAD 284 TO PLEASANT OAK DRIVE | 06/26/2013 | 1 (08/21/2012) | Details CEM-3701 Report |