Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17201-17210 of 17307 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215567Project ID: 215567
DEA: 081L3503
EFIS: 0820000060
COOP: 081712
08-SBD-83-2.4/2.9The project is a Caltrans widening along SR-83 in the City of Chino. The project proposes to construct right-turn lanes, a right in/right-out driveway, and a full access driveway leading to the proposed Euclid Commerce Center.The project limits are along SR-83 between Kimball Avenue and Bickmore Avenue between PM 2.4 and PM 2.9 in the City of Chino. 2 (03/05/2021)Details CEM-3701 Report
215568Project ID: 215568
DEA: 044H4404
EFIS: 0413000251
04-CC-4-33.4/0The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width.The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. 2 (03/11/2021)Details CEM-3701 Report
215599Project ID: 215599
DEA: 043G8404
EFIS: 0413000199
COOP: 042817
04-CC-4-20.1Bailey Road / SR4 Interchange Pedestrian & Bicycle Improvement ProjectBailey Rd Interchange03/07/20222 (03/16/2021)Details CEM-3701 Report
215619Project ID: 215619
DEA: 044Q1804
EFIS: 0419000357
COOP: 042796
Permit Numbers: 0421NOP0798
04-ALA-61-16.4/17.1construct 8ft. wide shoulder in both directions of travel; and a barrier separated Class-1 bike path, along northbound shoulder in conjunction with the safety improvement project between Swan Way to Langley Street, 2800 feet  2 (04/08/2024)Details CEM-3701 Report
215699Project ID: 215699
DEA: 044G3204
EFIS: 0412000446
04-SOL-80-7.27/0  09/01/20222 (04/14/2021)Details CEM-3701 Report
215717Project ID: 215717
DEA: 03372824
EFIS: 0319000152
03-ED-50-16.4/16/8Western Placerville Interchanges Project Phase 2.2Placerville on Highway 50 from Ray Lawyer Drive to eastbound Highway 50.01/14/20222 (04/19/2021)Details CEM-3701 Report
215754Project ID: 215754
DEA: 031J1304
EFIS: 0320000096
03-SAC-5-30.22/31.2Metro Air Parkway NB Aux Lane Improvement ProjectSR 99 Connector to I-5 Metro Air Parkway NB Auxiliary Lane03/04/20222 (05/07/2021)Details CEM-3701 Report
215735Project ID: 215735
DEA: 05465804
EFIS: 0500020105
05-SCR-1-9 Intersection Improvements  2 (05/17/2021)Details CEM-3701 Report
215738Project ID: 215738
DEA: 042Q8304
EFIS: 0419000056
COOP: 042803
04-ALA-680-4.8/5.0Improvements to the State Highway SystemSabercat Bridge and Trail connecting Ohlone College on the east side to future BART Station at Washington/Osgood and Blacow Road on the west, with a bicycle and pedestrian bridge over I-680 2 (09/07/2021)Details CEM-3701 Report
215769Project ID: 215769
Permit Numbers: 0420NDP1735
04---   NOT VERIFIEDDetails CEM-3701 Report