Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17171-17180 of 17307 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214890Project ID: 214890
DEA: 080A4414
EFIS: 0818000047
COOP: 081894
08-RIV-I-15-17.6/19.6Construction consists of additional of two new lanes on Railroad Canyon Road through interchange, reconstruction of the northbound diamond ramps to hook ramps to connect to Grape Street , construction of auxiliary and deceleration lanes on I-15Located at City of Lake Elsinore , 1.6 Mile South to 0.4 Mile North of Railroad Canyon Road undercrossing in Riverside County, CA. 2 (03/26/2020)Details CEM-3701 Report
214925Project ID: 214925
DEA: 080A9004
08-RIV-111-Avenue 66 at SR-111and Union Pacific Railroad Grade Separation 08/17/2021NOT VERIFIEDDetails CEM-3701 Report
214941Project ID: 214941
DEA: 044Q4704
EFIS: 0419000401
COOP: 042752
04-SCL-SR 17-6.2/9.3SR 17 Corridor Congestion Relief  2 (03/12/2021)Details CEM-3701 Report
214953Project ID: 214953
DEA: 063HT024
EFIS: 0617000190
06-KER-VAR-The Project consists of 21 miles of trackway for the High?Speed Rail through the counties of Tulare and Kern in the vicinity of Wasco, California. It includes several grade separated crossings, a pedestrian crossing, and a non-standard structure.Counties of Tulare and Kern at SR43/SR46 2 (05/05/2020)Details CEM-3701 Report
214959Project ID: 214959
Permit Numbers: 03206SN0062 0320ARD0556
03---   2 (09/14/2020)Details CEM-3701 Report
215011Project ID: 215011
DEA: 080F3214
EFIS: 0817000014
COOP: 081678
08-RIV-215-R27.9/R32.8New Ramps on E and W side of I-215 in a Diamond interchange config, shift the E Frontage RD, E of interchange and close the W Frontage Rd. Improvements will require widening of the existing bridge structures, Placentia St O/H over S CA Rail road & I-215.Limit of work o Placentia Avenue are from Harvill Avenue to the west and Indian Avenue to the East. 2 (05/19/2020)Details CEM-3701 Report
215012Project ID: 215012
DEA: 07314904
EFIS: 0715000147
07---   2 (08/13/2021)Details CEM-3701 Report
215068Project ID: 215068
DEA: 043A6414
EFIS: 0419000153
COOP: 042731
Permit Numbers: 0419NOP3024
04---   2 (09/07/2021)Details CEM-3701 Report
215189Project ID: 215189
COOP: CML5131(020)
--20-ARCADIA GOLD LINE STATION PEDESTRIAN LINKAGE PROJECTAROUND THE GOLD LINE ARCADIA STATION NOT VERIFIEDDetails CEM-3701 Report
215104Project ID: 215104
DEA: 11407724
EFIS: 1114000130
COOP: 23119503
Permit Numbers: 1119NMC0791
11-SD-94-14.25/15SR-94 AND JAMACHA 08/25/20212 (08/06/2020)Details CEM-3701 Report