Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214101 | Project ID: 214101 Permit Numbers: 0417NMC1910 | 04-SM-82-9.35-10.07 | The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... | 08/13/2021 | 2 (08/28/2019) | Details CEM-3701 Report | |
214131 | Project ID: 214131 DEA: 080N69U4 EFIS: 0812000307 COOP: 081635 | 08-RIV-60-22.1/22.6 | Improving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages. | R-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively. | 2 (04/30/2019) | Details CEM-3701 Report | |
214168 | Project ID: 214168 DEA: 042358A4 EFIS: 0419000385 | 04-SM-101-16.3/17.1 | Interchange Landscaping Improvemetns | 2 (08/28/2019) | Details CEM-3701 Report | ||
214248 | Project ID: 214248 DEA: 041K2803 EFIS: 0416000224 COOP: 042753 | 04-SCL-101-28.4.28.9 | Modification of US 101/Blossom Hill Road Interchange | 05/26/2022 | 2 (07/09/2019) | Details CEM-3701 Report | |
214197 | Project ID: 214197 DEA: 100H8904 EFIS: 1012000159 | 10-SJ-120-R0.9/R3.3 | State Route 120/McKinley Avenue Interchange Project in cooperation with City of Manteca and San Joaquin Council of Governments. | 2 (06/26/2019) | Details CEM-3701 Report | ||
214199 | Project ID: 214199 DEA: 024F4204 EFIS: 0212000111 COOP: 020155 Permit Numbers: 0219NRP0130 | 02-LAS-36-26.79 | Construct a new public road connection and signal on SR 36. Project includes on intersection of signal and light poles. | SR-36 at connection of new Skyline Road extension (PM 26.79) in Susanville, Lassen County. | 04/15/2020 | 2 (06/03/2019) | Details CEM-3701 Report |
214458 | Project ID: 214458 DEA: 07316304 EFIS: 0715000199 Permit Numbers: 0719AOP1456 | 07---3.274/-1 | Roadway Widening (includes new pavement section, new curb & gutter, and sidewalk modifications) removal of raised medians, curb ramp construction, signing, striping, traffic signal modifications/installations.The proposed improvements will be implemented at the following intersections:*Intersec | Western Avenue (SR-213) and various locations, Los Angeles, Rancho Palos Verdes, Lomita | 11/30/00-1 | 2 (01/22/2020) | Details CEM-3701 Report |
214238 | Project ID: 214238 Permit Numbers: 0319AOP0099 | 03--- | 04/23/2021 | 2 (09/19/2019) | Details CEM-3701 Report | ||
214261 | Project ID: 214261 DEA: 06484604 EFIS: 0600000484 COOP: 061726 | 06--,99- | The bridge work includes construction of ten (10) new bridges as part of the future SR-58 Centennial Corridor. This work includes constructing one (1) Viaduct, four (4) Undercrossings, three (3) Overcrossings, and two (2) Connector Overcrossings. In addit | n Kern County in Bakersfield on Route 58 from 0.1 miles west of Mohawk St to Cottonwood Rd and on Route 99 from 0.8 miles south of Route 58 to 0.3 Miles north of Route 58 | 2 (08/05/2019) | Details CEM-3701 Report | |
214262 | Project ID: 214262 Permit Numbers: 0419NMC0761 0419NRT1587 | 04---10.8 | The City of Milpitas proposes to rehalabilitate three (3) road segments. | McCarthy Blvd, Hillview Dr and Jacklin Rd, Milpitas | 2 (08/19/2019) | Details CEM-3701 Report |