Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17141-17150 of 17601 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211933 | Project ID: 211933 DEA: 060T7404 | 06-TUL-65,216-0.0/R6.9,2.9/11.7 | POLYMER ASPHALTIC EMULSION SEAL COAT | TULARE COUNTY NEAR DUCOR ON ROUTE 65 FROM KERN COUNTY LINE TO 0.1 MILE SOUTH OF AVENUE 56 AND IN AND NEAR VISALIA ON ROUTE 216 FROM 0.4 MILE EAST OF MCAULIFF STREET TO AVENUE 344 | 10/10/2017 | 1 (10/10/2017) | Details CEM-3701 Report |
3475 | Project ID: 3475 DEA: 06471904 | 06-TUL-99-2.7/3.6 | BRIDGE REPLACEMENT BR # 46-0169L/R | TULARE COUNTY NEAR EARLIMART FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF AVENUE 24 UNDERCROSSING | 08/17/2012 | 1 (01/12/2011) | Details CEM-3701 Report |
215390 | Project ID: 215390 DEA: 061A9604 EFIS: 0620000138 | 06-TUL-99-41.3/52.0 | COLD PLANE PAVEMENT AND PLACE RHMA (OGFC). | TULARE COUNTY NEAR GOSHEN FROM 0.2 MILE NORTH OF GOSHEN OVERHEAD TO 0.2 MILE NORTH OF DODGE AVENUE OVERCROSSING | 11/22/2021 | 1 (01/04/2021) | Details CEM-3701 Report |
210278 | Project ID: 210278 DEA: 060T1804 EFIS: 0615000031 | 06-TUL-99-41.3/52.0 | PLACE RUBBERIZED HMA OPEN GRADED (BWC) ON EXISTING PAVEMENT. | TULARE COUNTY NEAR GOSHEN FROM 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD TO 0.2 MILE NORTH OF DODGE AVENUE OVERCROSSING | 07/31/2017 | 1 (03/23/2015) | Details CEM-3701 Report |
7502 | Project ID: 7502 DEA: 06360214 EFIS: 0600020408 | 06-TUL-99-R37.3/41.3 | WIDENING FREEWAY FROM 4-LANE TO 6-LANE | TULARE COUNTY NEAR GOSHEN FROM 0.9 MILE SOUTH OF WEST VISALIA OVERHEAD TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD | 06/11/2018 | 1 (09/17/2012) | Details CEM-3701 Report |
212803 | Project ID: 212803 DEA: 060T8004 EFIS: 0615000231 | 06-TUL-99-R37.3/41.3 | RESURFACE EXISTING PAVEMENT WITH RHMA-OPEN (BWC). | TULARE COUNTY NEAR GOSHEN FROM 0.9 MILE SOUTH OF WEST VISALIA OVERHEAD TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD | 04/14/2021 | 1 (12/19/2018) | Details CEM-3701 Report |
211367 | Project ID: 211367 DEA: 060T8704 EFIS: 0615000173 | 06-TUL-99-51.3/52.3 | JOINTED PLANE CONCRETE PAVEMENT LANE AND INDIVIDUAL SLAB REPLACEMENT. | TULARE COUNTY NEAR KINGSBURG FROM 0.5 MILE SOUTH OF DODGE AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF KINGS RIVER BRIDGE | 08/03/2018 | 1 (09/21/2016) | Details CEM-3701 Report |
6991 | Project ID: 6991 DEA: 060N3004 | 06-TUL-201-0.0/14.0 | PLACE SLURRY SEAL ON EXISTING PAVEMENT. | TULARE COUNTY NEAR KINGSBURG FROM FRESNO AND TULARE COUNTY LINE TO JUNCTION 63 | 07/24/2012 | 1 (02/13/2012) | Details CEM-3701 Report |
994860 | Project ID: 994860 DEA: 061A5404 EFIS: 0620000062 | 06-TUL-201-0.0/4.9 | INSTALL RUMBLE STRIP, PAVEMENT DELINEATION AND TMS SYSTEM. | TULARE COUNTY NEAR KINGSBURG FROM FRESNO COUNTY LINE TO ROAD 56 | 1 (06/14/2023) | Details CEM-3701 Report | |
3160 | Project ID: 3160 DEA: 060F8004 | 06-TUL-198-L5711 | REMOVE CONTAMINATED MATERIAL AND PLACE BACKFILL MATERIAL. | TULARE COUNTY NEAR LEMON COVE AT THE LEMON COVE MAINTENANCE STATION | 06/01/2012 | 1 (10/17/2011) | Details CEM-3701 Report |