Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17131-17140 of 17322 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213523 | Project ID: 213523 DEA: 043K4104 EFIS: 0417000156 COOP: 042668 | 04-ALA-880-0.7 /1.3 | WEST GRAND AVE ON-RAMP IMPROVEMENT - BUS LANE PROJECT | The project is located between Interstate 880 from post mile 0.7 to 1.3, and on Interstate 80 from post mile 2.0 to 2.2. | 11/12/2019 | 2 (08/03/2018) | Details CEM-3701 Report |
215819 | Project ID: 215819 DEA: 060W1904 EFIS: 0617000115 COOP: 061663 | 06-MAD-145-24.5/25.459 | Widen eastbound State Route 145 from the intersection at State Route 41 to 1.2 miles west of State Route 41. The widening will include a turn pocket and an acceleration lane at the intersection with the proposed access road to Vulcan Materials. | State Route 145 from the intersection at State Route 41 to 1.2 miles west of State Route 41. | 08/16/2022 | 2 (06/23/2021) | Details CEM-3701 Report |
213547 | Project ID: 213547 DEA: 112T3452 EFIS: 1118000117 | 11-SD-5,8,52,75,163,805-Var | 2 (09/07/2018) | Details CEM-3701 Report | |||
213549 | Project ID: 213549 DEA: 080E1504 EFIS: 0800020201 COOP: 081662 | 08--- | 08/19/2021 | 2 (08/10/2018) | Details CEM-3701 Report | ||
213562 | Project ID: 213562 DEA: 043K2304 EFIS: 0417000116 | 04-ALA-I-880- | Construction of three new commuter parking lot facilities within Caltrans right-of-way under the Interstate 880 (I-880), I-80 and I-580 freeways to serve as park and ride lots for commuters. | the I-80/I-580/Buchanan Street interchange in the City of Albany (Location 1), and the I-880/Fruitvale Avenue interchange (Location 2) and I-880/High Street interchange (Location 3) in the City of Oakland. | 06/08/2022 | 2 (08/19/2019) | Details CEM-3701 Report |
213621 | Project ID: 213621 DEA: 033F6004 EFIS: 0313000077 Permit Numbers: 0317AOP0993 | 03-SAC-50-2.88/3.13 | Items requiring source inspection: 74 Ground anchors for the Brighton Overhead Retaining Wall | 02/10/2021 | 2 (04/26/2018) | Details CEM-3701 Report | |
213625 | Project ID: 213625 DEA: 11428504 EFIS: 1117000090 COOP: 118435 Permit Numbers: 11176DP0844 | 11-SD-75-12.65-13.15 | The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53 | SR-75 and Hooper Boulevard Intersection | 2 (09/12/2018) | Details CEM-3701 Report | |
213693 | Project ID: 213693 DEA: 080A0204 EFIS: 0800000011 COOP: 081617 | 08--- | 08/17/2021 | 2 (07/29/2021) | Details CEM-3701 Report | ||
213694 | Project ID: 213694 DEA: 11424504 EFIS: 1117000032 COOP: 118439 | 11--- | 08/19/2021 | 2 (07/29/2021) | Details CEM-3701 Report | ||
213916 | Project ID: 213916 DEA: 06484664 EFIS: 0618000213 COOP: 061681 | 06-KER-58,99-R52.1/R52.5 | RT 58/99 BAKERSFIELD FREEWAY CONNECTOR -widening the existing SR 58/SR 99 grade separation structure and realigning the Westbound to Southbound loop connector. Auxiliary lane and collector-distributor lanes on Southbound SR 99. | SR 58/SR 99 | 2 (03/12/2021) | Details CEM-3701 Report |