Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17111-17120 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215075 | Project ID: 215075 DEA: 060Q9104 EFIS: 0614000005 | 06-TUL-99-19.2/19.8 | BRIDGE DECK AND OUTSIDE GIRDER REPLACEMENT. | TULARE COUNTY NEAR TIPTON FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF AVENUE 152 OVERCROSSING | 05/11/2023 | 1 (07/28/2020) | Details CEM-3701 Report |
209260 | Project ID: 209260 DEA: 060Q2904 EFIS: 0613000112 | 06-TUL-99-22.4 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PAVE WITH HOT MIX ASPHALT. | TULARE COUNTY NEAR TULARE AT 1.1 MILES SOUTH OF AVENUE 184 OVERCROSSING AT THE PHILIP S. RAINE SAFETY ROADSIDE REST AREA | 12/14/2020 | 1 (12/19/2014) | Details CEM-3701 Report |
7801 | Project ID: 7801 DEA: 060N5404 EFIS: 0600020471 | 06-TUL-99-23.5 | COLD PLANE AC PAVEMENT AND PLACE HMA SURFACING. | TULARE COUNTY NEAR TULARE AT AVENUE 184 OVERCROSSING | 10/01/2014 | 1 (12/03/2012) | Details CEM-3701 Report |
209379 | Project ID: 209379 DEA: 060R2204 EFIS: 0614000059 | 06-TUL-137-18.2/27.4 | COLD IN-PLACE RECYCLING AND OVERLAY WITH HMA, SUPERPAVE (TYPE A). | TULARE COUNTY NEAR TULARE FROM 0.2 MILE WEST OF RANCH ACRES ROAD TO ROUTE 65 | 02/16/2021 | 1 (12/24/2014) | Details CEM-3701 Report |
210481 | Project ID: 210481 DEA: 060S5904 EFIS: 0614000264 | 06-TUL-198-R14.6 | REPAIR BRIDGE GIRDER. | TULARE COUNTY NEAR VISALIA AT ROAD 164 OVERCROSSING | 04/28/2016 | 1 (07/21/2015) | Details CEM-3701 Report |
7611 | Project ID: 7611 DEA: 060K5404 EFIS: 0600000249 | 06-TUL-63-2.9/3.2 | WIDEN INTERSECTION AND INSTALL SIGNAL. | TULARE COUNTY NEAR VISALIA FROM 0.1 MILE SOUTH TO 0.2 MILE NORTH OF AVENUE 256 | 10/01/2014 | 1 (09/17/2012) | Details CEM-3701 Report |
3220 | Project ID: 3220 DEA: 060H7204 | 06-TUL-198-R13.7/R16.7 | CONSTRUCT THRIE BEAM AND CONCRETE BARRIER. | TULARE COUNTY NEAR VISALIA FROM ROAD 156 UNDERCROSSING TO ROAD 180 | 08/25/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
215389 | Project ID: 215389 DEA: 060U0404 EFIS: 0615000191 | 06-TUL-63,137-12.1/R30.1,18.5/27.4 | INSTALL RUMBLE STRIP AND REPLACE ELECTRICAL SYSTEMS. | TULARE COUNTY NEAR VISALIA ON ROUTE 63 FROM AVENUE 328 TO FRESNO COUNTY LINE AND ON ROUTE 137 FROM ROAD 124 TO ROAD 196. | 05/04/2022 | 1 (01/04/2021) | Details CEM-3701 Report |
993301 | Project ID: 993301 DEA: 060U2804 EFIS: 0615000293 | 06-TUL-245-1.4,4.2 | PRECAST PRESTRESSED CONCRETE BOX GIRDER AND SLAB, BRIDGE REMOVAL. | TULARE COUNTY NEAR WOODLAKE AT YOKOHL CREEK BRIDGE AND AT KAWEAH RIVER BRIDGE | 1 (10/11/2021) | Details CEM-3701 Report | |
210245 | Project ID: 210245 DEA: 060S2004 EFIS: 0614000119 | 06-TUL-245-12.0/16.0,21.0/26.0 | RESURFACE EXISTING PAVEMENT WITH HOT MIX ASPHALT (TYPE A). | TULARE COUNTY NEAR WOODLAKE FROM ROUTE 201 TO 0.2 MILE NORTH OF AVENUE 404 AND FROM 0.2 MILE NORTH OF COTTONWOOD CREEK TO 2.4 MILES NORTH OF DRUM VALLEY ROAD | 04/05/2021 | 1 (03/24/2015) | Details CEM-3701 Report |