Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17101-17110 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
3398 | Project ID: 3398 DEA: 06337404 EFIS: 0600020150 | 06-TUL-190-21.2/26.4 | COLD PLANE AND PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILE EAST OF ROAD 284 TO PLEASANT OAK DRIVE | 07/28/2020 | 1 (03/21/2011) | Details CEM-3701 Report |
7167 | Project ID: 7167 DEA: 06337414 EFIS: 0600020605 | 06-TUL-190-21.2/26.4 | COLD PLANE AND PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILE EAST OF ROAD 284 TO PLEASANT OAK DRIVE | 06/26/2013 | 1 (08/21/2012) | Details CEM-3701 Report |
210502 | Project ID: 210502 DEA: 060J5304 EFIS: 0600000188 | 06-TUL-190-20.9/21.2 | INTERSECTION IMPROVEMENT | TULARE COUNTY NEAR PORTERVILLE FROM 0.2 MILE WEST OF ROAD 284 TO 0.1 MILE EAST OF ROAD 284 | 07/06/2021 | 1 (07/21/2015) | Details CEM-3701 Report |
6990 | Project ID: 6990 DEA: 060N2404 EFIS: 0600020496 | 06-TUL-65-14.0/15.0 | COLD PLANE AC AND OVERLAY WITH HMA AND HMA (TYPE A WITH PG-TR). | TULARE COUNTY NEAR PORTERVILLE FROM AVENUE 112 TO 0.1 MILE SOUTH OF AVENUE 120 | 06/28/2012 | 1 (06/06/2012) | Details CEM-3701 Report |
215147 | Project ID: 215147 DEA: 060X0404 EFIS: 0618000013 | 06-TUL-65,190-0.0/R15.1,8.0/26.5 | INSTALL RUMBLE STRIPS. | TULARE COUNTY NEAR PORTERVILLE ON ROUTE 65 FROM KERN COUNTY LINE TO 0.5 MILE SOUTH OF AVENUE 124 AND ON ROUTE 190 FROM ROAD 180 TO PLEASANT OAK DRIVE | 04/04/2022 | 1 (09/14/2020) | Details CEM-3701 Report |
1000080 | Project ID: 1000080 DEA: 061F2004 EFIS: 0622000190 | 06-TUL-190-R32.8,R40.0 | PLACE POLYESTER CONCRETE OVERLAY, EPOXY INJECTION, AND JOINT SEAL. | TULARE COUNTY NEAR SPRINGVILLE AT NORTH FORK TULE RIVER BRIDGE AND AT NORTH FORK MIDDLE FORK TULE RIVER BRIDGE | 1 (01/29/2024) | Details CEM-3701 Report | |
993440 | Project ID: 993440 DEA: 060H1404 EFIS: 0616000194 | 06-TUL-190-34.7/39.4 | REMOVE AND REPLACE DRAINAGE SYSTEMS. | TULARE COUNTY NEAR SPRINGVILLE AT VARIOUS LOCATIONS FROM 2.4 MILES EAST OF BALCH PARK ROAD TO 0.6 MILE WEST OF WISHON ROAD | 05/10/2023 | 1 (12/09/2021) | Details CEM-3701 Report |
993427 | Project ID: 993427 DEA: 061C4004 EFIS: 0621000165 | 06-TUL-198,245-37.5/41.3,6.0/8.1 | COLD PLANE AC PAVEMENT, HMA (TYPE A), SLURRY SEAL, AND STRIPING. | TULARE COUNTY NEAR THREE RIVERS ON ROUTE 198 FROM 0.3 MILE EAST OF THREE RIVERS DRIVE TO ROAD TO SAINT ANTHONY AND IN WOODLAKE ON ROUTE 245 FROM SAINT JOHNS RIVER TO CAJON AVENUE | 10/03/2022 | 1 (12/06/2021) | Details CEM-3701 Report |
3061 | Project ID: 3061 DEA: 060A9704 EFIS: 0600000019 | 06-TUL-99-22.4 | DEMOLISH AND CONSTRUCT NEW FACILITIES AND LANDSCAPING AT REST AREA. | TULARE COUNTY NEAR TIPTON AT THE PHILIP S. RAINE SAFETY ROADSIDE REST AREA | 05/21/2020 | 1 (05/05/2011) | Details CEM-3701 Report |
212587 | Project ID: 212587 DEA: 06461504 EFIS: 0600020148 | 06-TUL-190-0.0/8.0 | LANE AND SHOULDER WIDENING AND OVERLAY | TULARE COUNTY NEAR TIPTON FROM 0.1 MILE WEST OF ROUTE 99 TO 0.1 MILE EAST OF ROAD 180 | 08/13/2020 | 1 (04/24/2018) | Details CEM-3701 Report |