7558 | Project ID: 7558 EFIS: 0000001155 Permit Numbers: 0612NDP0384 | 06-KER-99-54.48/54.48 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Kern County in Delano at and near the Woollomes Avenue Overcrossing Interchange (PM 54.48) to set up, maintain, and remove temporary traffic control necessary in order to construct the | Woollomes Ave. Interchange, Delano | 07/30/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
10039 | Project ID: 10039 DEA: 080F1624 EFIS: 0800000216 | 08-RIV-215-R14.2/R28.5 | INTERSTATE 215 WIDENING | IN RIVERSIDE COUNTY ON ROUTE 215 FROM SCOTT ROAD OVERCROSSING TO NUEVO ROAD OVERCROSSING | 08/25/2021 | 2 (01/22/2013) | Details CEM-3701 Report |
7582 | Project ID: 7582 EFIS: 0000001155 Permit Numbers: 05126UL0290 | 05-MON-101-87.97/87.97 | expose gas transmission line and inspect cathodic protection | Hwy 101, Salinas | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
7583 | Project ID: 7583 DEA: 023E8604 EFIS: 0200020188 MINOR: 02A1205 | 02-SHA-5-R25.6 | Generator and Sound Wall | At Bass Mountain | 12/21/2020 | 2 (06/20/2014) | Details CEM-3701 Report |
7602 | Project ID: 7602 EFIS: 0000001155 Permit Numbers: 04126DP1054 | 04-MRN-1-0/0.39 | Per the submitted project drawings, construct a three-way Traffic install traffic signal, pedestrian crosswalk and associated pedestrian facilities on State Highway 04-Mrn-1, Post Mile 0.39, in the County of Marin. | SHORELINE HWY, MILL VALLEY | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report |
7606 | Project ID: 7606 DEA: 08448114 EFIS: 0800020451 | 08-SBD-10-25.3/26.3 | I-10/Tippecanoe Interchange Improvements-Phase 1. | In the cities of Loma Linda and San Bernardino, from 1 mile west of Tippecanoe Avenue to Tippecanoe Avenue. Construct eastbound auxiliary lane, eastbound off ramp, retaining walls, reinforced concrete box culvert, and widen San Timoteo Bridge. | 08/25/2021 | 2 (02/14/2013) | Details CEM-3701 Report |
7614 | Project ID: 7614 EFIS: 0000001155 Permit Numbers: 0412NRD1251 | 04-MRN-1-0.65-0.9 | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report | ||
7621 | Project ID: 7621 DEA: 02347604 EFIS: 0200000251 | 02-SHA-5-R4.2/R4.6 | Interchange reconstruction, including construction of a new off ramp, roundabout intersection, and widening of Deschutes Road/Factory Outlets Drive. | FOR CONSTRUCTION ON STATE HIGHWAY IN SHASTA COUNTY IN AND NEAR ANDERSON FROM 0.3 MILES SOUTH TO 0.1 MILES NORTH OF DESCHUTES ROAD UNDERCROSSING | 03/26/2021 | 2 (06/01/2012) | Details CEM-3701 Report |
7622 | Project ID: 7622 EFIS: 0000001155 Permit Numbers: 12126SN0201 | 12-ORA-405-16.5/16.5 | move and replace two existing luminaries (#3908 & #3909) along the NB I-405 and Beach Blvd. (SR-39) loop off-ramp with two luminaries at new locations as shown on the attached Permit Plan stamp-dated April 11, 2012. The new luminaries will consist of | i-405, Huntington beach | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
7624 | Project ID: 7624 DEA: 09343904 EFIS: 0912000014 MINOR: 09A0522 | 09-INY-168-R19.4/54.4 | Furnish and Install Roadside Signs | 1.2 mile east of Rte 395 , near Big Pine | 2 (06/24/2021) | Details CEM-3701 Report |