Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17071-17080 of 17605 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
7546 | Project ID: 7546 DEA: 06324514 EFIS: 0612000051 | 06-TUL,TUL-99-Var | IRRIGATION, PLANTING, PAVING, AND PLANT ESTABLISHMENT | TULARE AND FRESNO COUNTIES AT VARIOUS LOCATIONS | 07/31/2017 | 1 (08/30/2012) | Details CEM-3701 Report |
213446 | Project ID: 213446 DEA: 060T3604 EFIS: 0615000066 | 06-FRE,TUL-99-Var | ROADSIDE SAFETY IMPROVEMENTS. | TULARE AND FRESNO COUNTIES AT VARIOUS LOCATIONS | 08/07/2019 | 1 (12/19/2018) | Details CEM-3701 Report |
3395 | Project ID: 3395 DEA: 06324504 EFIS: 0600000366 | 06-TUL,FRE-99-41.3/R53.9,R0.0/R1.2 | WIDEN 4 LANES TO 6 LANES. | TULARE AND FRESNO COUNTIES IN AND NEAR KINGSBURG FROM 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD TO 0.2 MILE NORTH OF ROUTE 99/201 CONEJO AVENUE SEPARATION | 02/16/2021 | 1 (04/11/2012) | Details CEM-3701 Report |
994577 | Project ID: 994577 DEA: 060V7604 EFIS: 0616000220 | 06-TUL,FRE-99-51.8/R53.9,R0.0/R0.3 | UPGRADE WATER AND WASTEWATER SYSTEMS AT ROADSIDE REST AREA. | TULARE AND FRESNO COUNTIES IN AND NEAR KINGSBURG FROM DODGE AVENUE OVERCROSSING TO 0.7 MILE NORTH OF MENDOCINO AVENUE OVERCROSSING | 1 (05/10/2023) | Details CEM-3701 Report | |
208620 | Project ID: 208620 DEA: 060P6104 EFIS: 0612000185 | 06-KIN,TUL-43-18.2/27.2,9.5/22.7, | PLACE RHMA-G AND RBWC-G ON EXISTING PAVEMENT. | TULARE AND KINGS COUNTIES NEAR CORCORAN AND HANFORD FROM 0.6 MILE SOUTH OF DEEK CREEK BRIDGE TO KINGS COUNTY LINE AND FROM ROUTE 43/198 SEPARATION TO FRESNO COUNTY LINE | 01/30/2015 | 1 (10/30/2013) | Details CEM-3701 Report |
8142 | Project ID: 8142 DEA: 060M8004 EFIS: 0600020012 | 06-MAD,MAD-65,99-25.2/25.6,23.3/23.8 | CONSTRUCT THRIE BEAM AND CONCRETE MEDIAN BARRIER | TULARE AND MADERA COUNTIES ON ROUTE 65 FROM 0.1 MILES NORTH OF AVENUE 196 TO 0.1 MILES SOUTH OF AVENUE 200 AND ON ROUTE 99 FROM 0.2 MILES NORTH OF CALIFA UNDERPASS TO AVENUE 24 OVERCROSSING | 05/28/2013 | 1 (12/10/2012) | Details CEM-3701 Report |
213669 | Project ID: 213669 DEA: 06324524 EFIS: 0617000065 MINOR: 06A2459 | 06-TUL-52.5- | KINGS RIVER MITIGATION PLANT ESTABLISHMENT | Tulare County | 11/29/2022 | 1 (01/31/2020) | Details CEM-3701 Report |
993284 | Project ID: 993284 DEA: 060U7704 EFIS: 0616000035 | 06-TUL-99-22.3 | INSTALL WATER/WASTEWATER SYSTEMS AND LANDSCAPE WORK. | TULARE COUNTY 3 MILES NORTH OF TIPTON AT THE PHILIP S RAINE SAFETY ROADSIDE REST AREA | 1 (10/04/2021) | Details CEM-3701 Report | |
209069 | Project ID: 209069 DEA: 060N3904 EFIS: 0600020698 | 06-TUL-245-20.8 | CONSTRUCT ROCK SLOPE PROTECTION. | TULARE COUNTY ABOUT 10 MILES SOUTH OF BADGER AT COTTONWOOD CREEK BRIDGE | 08/06/2015 | 1 (10/15/2014) | Details CEM-3701 Report |
1000649 | Project ID: 1000649 DEA: 061H3404 EFIS: 0625000042 | 06-TUL-99-23.49 | BRIDGE REPAIR FOR BR #46 0192 | Tulare County along NB SR 99 at Avenue 184 OC, Bridge #46 0192. | 1 (09/26/2024) | Details CEM-3701 Report |