Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 161-170 of 17636 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
4238 | Project ID: 4238 DEA: 073X3404 | 07-LA-105-13.5 | Repair Storm damaged support slopes and and undermine shoulder and soundwall | WB 105 to 719 trans ition. | 06/25/2012 | 1 (06/25/2012) | Details CEM-3701 Report |
4236 | Project ID: 4236 DEA: 073X3104 | 07-LA-10-42.6/42.8 | Reconstruct R/W Fence and repair V ditch | WB 10 to NB 57 transition | 08/03/2011 | 1 (08/03/2011) | Details CEM-3701 Report |
995087 | Project ID: 995087 DEA: 051P5904 EFIS: 0522000086 | 05-SCR-1-0.0/5.0 | Cold plane, RHMA-G | Watsonville area, County line to Scenic pullout | 08/13/2024 | 1 (08/21/2023) | Details CEM-3701 Report |
210752 | Project ID: 210752 DEA: 051G7904 | 05-SB-101,154-10.8/22.5,R22.5,R31.3/R32.3, VAR | Water Conservation measures- upgrade irrigation systems with " Smart " irrigation technology to maximie water conservation at various locations in Santa Barbara and Goleta | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report | |
213771 | Project ID: 213771 DEA: 081K3404 EFIS: 0819000023 | 08-SBD-215- | Repair Bridge | Washington Street OC | 1 (11/21/2018) | Details CEM-3701 Report | |
1531 | Project ID: 1531 EFIS: 0000001155 Permit Numbers: 0407NMC0122 04096DP0643 0409NRD0771 | 04-ALA-880-0/20.621 | Remove and replace top 40 inches of asphalt concrete in the existing roadway of Washington Ave. | Washington Ave. on ramp to I-880, San Leandro | 04/29/2011 | NOT VERIFIED | Details CEM-3701 Report |
7598 | Project ID: 7598 DEA: 042332C4 EFIS: 0400000668 COOP: 042346 Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731 | 04-ALA-262-0/0.5 | Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges; | Warm Springs Blvd, Fremont | 06/03/2015 | 1 (12/12/2012) | Details CEM-3701 Report |
993475 | Project ID: 993475 Permit Numbers: 0320NSN1372 0321NRT1538 | 03---8.433/8.622 | Citywide Systemic Safety Improvements Project | Walnut St., Chico | 1 (03/24/2022) | Details CEM-3701 Report | |
1637 | Project ID: 1637 DEA: 040AA104 EFIS: 0400020172 MINOR: 04A3451 | 04-CC-5745- | Install power generation system using photovoltaic panels | Walnut Creek East Maintenance Station | 1 (12/09/2019) | Details CEM-3701 Report | |
215100 | Project ID: 215100 DEA: 071XP904 EFIS: 0720000158 | 07-LA-118-R5.75, R5.75/R5.75, 5.75/5.75 | REPAIR FAILED DRAINAGE SYSTEM ON LA COUNTY W/B LA-118 RESEDA BLVD | W/B LA-118 RESEDA BLVD | 10/02/2023 | 1 (06/30/2021) | Details CEM-3701 Report |