Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16911-16920 of 17447 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
7452Project ID: 7452
EFIS: 0000001155
Permit Numbers: 05126SE0197
05-SCR-9-5.79/6.46Detour highway traffic onto local roads for Felton Remembers Parade on May 28, 2012 from 9:30 AM to 12 NoonHighway 9, Felton09/18/2018NOT VERIFIEDDetails CEM-3701 Report
7454Project ID: 7454
EFIS: 0000001155
Permit Numbers: 08126DP0403
08-RIV-10-54.52/54.93Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street lightMonroe Street, Indio01/21/20132 (01/21/2013)Details CEM-3701 Report
7473Project ID: 7473
EFIS: 0000001155
Permit Numbers: 0312NSN0037
03-YOL-128-9.67/9.67Construction of new traffic signal with intersection widening and removal of free-right turn at I-505 SB off-ramp. The project also includes north side pedestrian improvements at the intersection, storm drainage, water and sewer improvementsHwy 128 (Grant Ave), Winters04/27/20182 (12/05/2014)Details CEM-3701 Report
7475Project ID: 7475
DEA: 04445604
EFIS: 0400001081
COOP: 042434
Permit Numbers: 0412NMC0872 0412NDP1643
04-SCL-280-5.1/5.2,0.0/0.8The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, wideningIn San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing05/07/20192 (12/11/2012)Details CEM-3701 Report
7477Project ID: 7477
DEA: 071W0404
EFIS: 0700020905
MINOR: 07A3180
07-LA-60-11.5/20.1Plant EstablishmentIN LOS ANGELES COUNTY AND IN THE CITY OF INDUSTRY ON ROUTE 60 FROM 0.2 MILES EAST OF THE 605/60 SEPARATION TO 0.2 MILES WEST OF NOGALES St ESTABLISH EXISTING PLANTING08/17/20212 (07/09/2021)Details CEM-3701 Report
7478Project ID: 7478
DEA: 04246584
04-CC-4-State route 4 bypass in cities of Antioch and Brentwood from 0.5 N of lone tree way to 0.3 mile north of sand creek 08/18/20222 (12/01/2012)Details CEM-3701 Report
7479Project ID: 7479
DEA: 051C5804
EFIS: 0512000178
05---  08/27/2019NOT VERIFIEDDetails CEM-3701 Report
7507Project ID: 7507
DEA: 060M9604
EFIS: 0600020398
MINOR: 06A1763
06-TUL-190-11.41Install Flshing BeaconsNear Porterville at Intersection of Rte 190 and 20810/16/20202 (12/05/2014)Details CEM-3701 Report
7508Project ID: 7508
DEA: 060M9504
EFIS: 0600020397
MINOR: 06A1772
06-TUL-63-12.13Modify Signal and LightingNear Visalia at Intersection of Rte 63 and Ave 32810/16/20202 (12/05/2014)Details CEM-3701 Report
7510Project ID: 7510
DEA: 024E5004
EFIS: 0200020323
MINOR: 02A1197
02-SHA-5,299-VarCHAIN LINK FENCEAT VARIOUS LOCATIONS12/21/20202 (06/20/2014)Details CEM-3701 Report