Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16751-16760 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214802 | Project ID: 214802 DEA: 031G7004 EFIS: 0319000135 | 03-SUT-99-28.0/30.6 | COLD PLANE AC PAVEMENT, RHMA OVERLAY, & INDUCTIVE LOOP DETECTORS. | SUTTER COUNTY IN AND NEAR YUBA CITY FROM 0.1 MILE NORTH OF SMITH ROAD TO ROUTE 20 | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
965 | Project ID: 965 DEA: 031F5004 EFIS: 0300020036 | 03-SUT-99-T49.2/R51.8 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | SUTTER COUNTY IN AND NEAR YUBA CITY FROM ROUTE 20 TO 1.4 KM NORTH OF QUEENS AVENUE OVERCROSSING | 11/04/2016 | 1 (10/25/2010) | Details CEM-3701 Report |
7529 | Project ID: 7529 DEA: 031A4644 EFIS: 0300020246 | 03-SUT-99,113-R20.0,16.4 | CONSTRUCT INTERCHANGE WITH CIP PS BOX GIRDER BR, IB, AB, HMA, RHMA. | SUTTER COUNTY IN TUDOR AT ROUTE 99/113 SEPARATION | 02/06/2015 | 1 (09/24/2012) | Details CEM-3701 Report |
210275 | Project ID: 210275 DEA: 033F7904 EFIS: 0313000189 | 03-SUT-20-16.5 | REPLACE SIGNAL POLES FOR E/B AND W/B TRAFFIC, UPGRADE ADA FACILITIES. | SUTTER COUNTY IN YUBA CITY AT PLUMAS STREET | 06/15/2020 | 1 (03/24/2015) | Details CEM-3701 Report |
214103 | Project ID: 214103 DEA: 030H8904 EFIS: 0316000030 | 03-SUT-20-13.6/13.8 | PLACE HMA, HMA-TYPE O, BASE AND LOOP DETECTORS. | SUTTER COUNTY IN YUBA CITY FROM GEORGE WASHINGTON BOULEVARD TO 0.7 MILE WEST OF HARTER PARKWAY | 05/05/2020 | 1 (04/29/2019) | Details CEM-3701 Report |
969 | Project ID: 969 DEA: 031F8104 | 03-SUT-113-0.0/4.7,5.1/R10.8 | PAVEMENT REHABILITATION AND OVERLAY | SUTTER COUNTY NEAR KNIGHTS LANDING FROM CRANMORE/KNIGHTS ROAD TO 0.1 MILE NORTH OF RIGGINS ROAD AND FROM SACRAMENTO VALLEY BOULEVARD TO SUTTER CAUSEWAY BRIDGE | 08/31/2012 | 1 (08/08/2011) | Details CEM-3701 Report |
213211 | Project ID: 213211 DEA: 030G1204 | 03-SUT-20-R0.2/4.2 | RUBBERIZED ASPHALT CONCRETE OVERLAY | SUTTER COUNTY NEAR MERIDIAN FROM 0.1 MILE EAST OF MERIDIAN ROAD TO SUTTER BYPASS BRIDGE | 01/02/2019 | NOT VERIFIED | Details CEM-3701 Report |
901 | Project ID: 901 DEA: 031A4324 EFIS: 0300000206 | 03-SUT-99-10.9/14.7 | Widen to provide four lane segment. | SUTTER COUNTY NEAR NICOLAUS FROM POWER LINE ROAD TO 0.1 MILE SOUTH OF LAUREL AVENUE | 12/05/2017 | 1 (05/21/2012) | Details CEM-3701 Report |
7786 | Project ID: 7786 DEA: 031A43A4 EFIS: 0313000005 | 03-SUT-99-10.9/14.7 | Sutter 99 Feather River Bridge : Widen to provide four lane segment | SUTTER COUNTY NEAR NICOLAUS FROM POWER LINE ROAD TO 0.1 MILE SOUTH OF LAUREL AVENUE | 11/30/2017 | 1 (10/02/2012) | Details CEM-3701 Report |
952 | Project ID: 952 DEA: 031F0204 | 03-SUT-20-8.9/9.5 | INSTALL TRAFFIC SIGNAL | SUTTER COUNTY NEAR SUTTER AT ACACIA AVENUE | 11/28/2012 | 1 (11/28/2012) | Details CEM-3701 Report |