Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16691-16700 of 17605 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214790 | Project ID: 214790 DEA: 101H3204 EFIS: 1018000021 | 10-STA-5-20.0,26.3 | REALIGN CABLE AND THRIE BEAM MEDIAN BARRIERS AND CONSTRUCT PASSAGEWAYS | STANISLAUS COUNTY NEAR WESTLEY AT 0.7 MILE SOUTH OF KERN CREEK ROAD UNDERCROSSING AND 0.7 MILE NORTH OF KHALSA ROAD UNDERCROSSING | 06/27/2022 | 1 (03/16/2020) | Details CEM-3701 Report |
5874 | Project ID: 5874 DEA: 102A2904 | 10-STA-33-23.4 | REPLACE BRIDGE. | STANISLAUS COUNTY NEAR WESTLEY AT INGRAM CREEK BRIDGE | 01/04/2013 | 1 (10/04/2010) | Details CEM-3701 Report |
213385 | Project ID: 213385 DEA: 101C4604 EFIS: 1016000075 | 10-STA,TUO,MPA-108,120-Var | CONSTRUCT CENTERLINE, SHOULDER AND EDGE-LINE RUMBLE STRIP. | STANISLAUS, TUOLUMNE,AND MARIPOSE COUNTIES AT VARIOUS LOCATIONS. | 08/31/2020 | 1 (12/20/2018) | Details CEM-3701 Report |
210180 | Project ID: 210180 DEA: 101C9004 EFIS: 1014000185 | 10-STA-5,27-41.0/51.0 | REPAIR FAILED AREAS AND RUBBERIZED HMA RESURFACING. | STANLISLAUS COUNTY AT AND NEAR LA GRANGE FROM 2.2 MILES EAST OF TOULUMNE RESORT RIGHT TO TOULUMNE COUNTY LINE. | 11/14/2016 | 2 (01/30/2015) | Details CEM-3701 Report |
6807 | Project ID: 6807 DEA: 120L9304 EFIS: 1200020246 MINOR: 12A1363 | 12-ORA-39- | Construct Wash Rack at the Stanton Maintenance Station | Stanton Maintenance Station | 09/28/2012 | NOT VERIFIED | Details CEM-3701 Report |
2372 | Project ID: 2372 DEA: 044A5354 | 04-ALA,CC-4,24-VAR | INSTALL WIRELESS MAGNETOMETER VEHICLE DETECTION STATION | State Highway (various locations) in Alameda/Contra Costa counties. | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
209233 | Project ID: 209233 Permit Numbers: 1013NMC0028 | 10-SJ-4-15.05/15.16 | Widen, stripe, and place sidewalk, curb, gutter, and curb ramp, as shown on the plans, within State Highway 4 right of way at Fresno Avenue in the City of Stockton in San Joaquin County. This Permit also allows to widen State Highway 4 westbound for right | State Highway 4 right of way at Fresno Avenue in the City of Stockton in San Joaquin County | 12/04/2018 | 1 (12/19/2013) | Details CEM-3701 Report |
4698 | Project ID: 4698 Permit Numbers: 08076DP0284 0805NMC0777 | 08-RIV-74-30.566-30.814 | Modify Traffic Signal | State Highway 74 at Briggs Road intersection in the County of Riverside | 07/29/2010 | NOT VERIFIED | Details CEM-3701 Report |
210794 | Project ID: 210794 DEA: 062HT104 EFIS: 0612000287 | 06-FRE-99-23.5/26.7 | (Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST). | State Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing. | 09/16/2020 | 1 (10/01/2015) | Details CEM-3701 Report |
209507 | Project ID: 209507 DEA: 100V8304 EFIS: 1012000122 | 10-SJ-99-31.5/37.5 | Replace Right of Way Fence | STATE HIGHWAY 99 IN SAN JOAQUIN COUNTYIN AND NEAR LODI AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF TURNER ROAD OVERCROSSING TO 0.3 MILE SOUTH OF LIBERTY ROAD UNDERCROSSING (SOUTH BOUND ONLY) | 07/28/2021 | 1 (04/17/2014) | Details CEM-3701 Report |