Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16331-16340 of 16958 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994210 | Project ID: 994210 DEA: 010G4204 EFIS: 0116000186 | 01-HUM-101-75.9/78.1 | Eureka Sidewalks & Curbs | 1 (09/09/2022) | Details CEM-3701 Report | ||
994211 | Project ID: 994211 DEA: 010H2004 EFIS: 0117000128 | 01-HUM-101-77.9/79.5 | 5th Street Safety | 1 (09/09/2022) | Details CEM-3701 Report | ||
994217 | Project ID: 994217 DEA: 042W5804 EFIS: 0421000238 | 04--- | BART PEDESTRIAN AND BIKE CONNECTIVITY PROJECT | 2 (10/03/2022) | Details CEM-3701 Report | ||
994218 | Project ID: 994218 DEA: 042W8704 EFIS: 0421000288 | 04-MRN--0/0.3 | Marin City Sea Level Rise | NOT VERIFIED | Details CEM-3701 Report | ||
994219 | Project ID: 994219 DEA: 024J4004 EFIS: 0223000020 | 02-SIS/SIS-97-6/35 | Remove bed-load material from highway, clean or replace culverts, clean and grade shoulder drainage coursesand other damaged areas. Place erosion control where appropriate. Provide traffic control as needed. | 07/27/2023 | 1 (09/14/2022) | Details CEM-3701 Report | |
994220 | Project ID: 994220 DEA: 024J3204 EFIS: 0223000012 | 02-SIS/SIS-96-0/105.82 | Remove and dispose of hazard trees, replace burnt wood posts, replace damaged culverts, install system hardening components (drainage, slopes, etc.) repair/replace damaged pavement, repair bridge damage and other miscellaneous associated items of work. | 08/10/2023 | 1 (09/14/2022) | Details CEM-3701 Report | |
994221 | Project ID: 994221 DEA: 072XA804 EFIS: 0722000315 | 07-LA/LA-710-7.99/7.89 | Repair damage to the SHS bridge structures, slopes, and other damages | 03/08/2023 | 1 (10/06/2022) | Details CEM-3701 Report | |
994222 | Project ID: 994222 DEA: 081N5204 EFIS: 0823000011 | 08-SBD/SBD-38-R11.3/26.8 | Debris Flow Mitigation: Erosion Control, Repair and Armor Embankments, Construct Earthen Berms, and Repair/Replace Flexible Barriers, Drainage and Roadway Appurtenances | 07/27/2023 | 1 (07/27/2023) | Details CEM-3701 Report | |
994223 | Project ID: 994223 DEA: 051P4004 EFIS: 0522000038 | 05-SLO/SLO-46-R4.8/R5.2 | Restore eroded slopes. Restore roadway profile. | 1 (09/19/2022) | Details CEM-3701 Report | ||
994224 | Project ID: 994224 DEA: 033J8004 EFIS: 0323000005 | 03-BUT/BUT-162-20.74/20.74 | Remove remove existing culverts, install a new 120-ft 24" CMP, backfill, minor HMA, striping | 07/26/2023 | 1 (09/14/2022) | Details CEM-3701 Report |