Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16311-16320 of 16643 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994847 | Project ID: 994847 DEA: 101P6504 EFIS: 1022000146 | 10-MER,SJ,STA-4,5,99-var | PREPARE AND PAINT CONCRETE BRIDGE AREAS AND ROCK SLOPE PROTECTION. | MERCED, SAN JOAQUIN AND STANISLAUS COUNTIES AT VARIOUS LOCATIONS | 1 (06/14/2023) | Details CEM-3701 Report | |
994848 | Project ID: 994848 DEA: 120S1704 EFIS: 1219000102 | 12-ORA-5-5.3/7.3 | REPLACE MEDIAN CONCRETE BARRIER AND INSTALL SAFETY LIGHTING. | ORANGE COUNTY FROM 0.5 MILE SOUTH OF CAMINO DE ESTRELLA IN SAN CLEMENTE TO 0.5 MILE NORTH OF ROUTE 1 IN SAN JUAN CAPISTRANO | 1 (07/07/2023) | Details CEM-3701 Report | |
994849 | Project ID: 994849 DEA: 101J0304 EFIS: 1018000073 MINOR: 10A2485 | 10-SJ-5- | REPLACE & RELOCATE Exist DIRECTION SIGN AND RAMP ADVISORY SPEED AND INSTALL NEW FLASHING BEACON | CONSTRUCTION IN SAN JOAQUIN COUNTY IN LATHROP AT SOUTHBOUND OFF RAMP TO EASTBOUND ROUTE 120 | 1 (06/14/2023) | Details CEM-3701 Report | |
994850 | Project ID: 994850 DEA: 044J4104 EFIS: 0415000343 | 04-NAP-29-11.7/5.1 | Replace and place cement liner on RCB culvert. | NAPA COUNTY IN AND NEAR AMERICAN CANYON AT RIO DEL MAR AND 0.4 MILE SOUTH OF NORTH KELLY ROAD. | NOT VERIFIED | Details CEM-3701 Report | |
994851 | Project ID: 994851 DEA: 034J5004 EFIS: 0323000177 | 03--- | 1 (05/31/2023) | Details CEM-3701 Report | |||
994852 | Project ID: 994852 DEA: 041Q7614 COOP: 042908 | 04--- | NOT VERIFIED | Details CEM-3701 Report | |||
994853 | Project ID: 994853 DEA: 051P0804 EFIS: 0521000165 MINOR: 05A2507 | 05-SCR--9.07/9.17 | For Construction On State Highway In Santa Cruz County, at Chittenden, at 0.9 mile from Old Chittenden Road. In District 05 On Route 129. | 1 (06/05/2023) | Details CEM-3701 Report | ||
994854 | Project ID: 994854 DEA: 061E5804 EFIS: 0622000071 | 06-KER-43,46-9.0/15.7, 20.0/27.5 | FOR CONSTRUCTION ON STATE HIGHWAY IN KERN COUNTY NEAR WASCO ON ROUTE 43 FROM 0.2 MILE SOUTH OF ROUTE 58 TO 0.5 MILE NORTH OF RIVERSIDE AVENUE AND ROUTE 46 FROM 0.5 MILE WEST OF ROUTE 33 TO HOLLOWAY ROAD | In District 06 On Route 43, 46 | 1 (06/14/2023) | Details CEM-3701 Report | |
994855 | Project ID: 994855 DEA: 01493304 EFIS: 0100000476 | 01-HUM-169-24.13/33.23 | 1 (06/07/2023) | Details CEM-3701 Report | |||
994856 | Project ID: 994856 DEA: 010H5604 EFIS: 0117000236 | 01-HUM-299-0.0/R5.7 | PLACE RHMA, REPLACE ASPHALT CONCRETE, AND CONCRETE BARRIER TRANSITION. | HUMBOLDT COUNTY IN AND NEAR ARCATA FROM ROUTE 299/101 SEPARATION TO 0.2 MILE EAST OF BLUE LAKE UNDERCROSSING | 1 (06/08/2023) | Details CEM-3701 Report |