Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16301-16310 of 17291 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211311 | Project ID: 211311 Permit Numbers: 08156CD0088 0816NRD0198 | 08-SBD-395-10.173/10.173 | Enter onto SR-395 right-of-way, at the southeast corner of Luna Road, in the City of Victorville of San Bernardino County to construct street improvements, including signal modification and temporary driveway, as per plans and SWPPP date stamped March 2, 2016, by Caltrans District 8 Encroachment Pe | SR-395, Victorville | 08/01/2018 | 1 (03/30/2016) | Details CEM-3701 Report |
213616 | Project ID: 213616 Permit Numbers: 0815NMC0798 08186DP0855 0818NRD0562 0818NRT0872 0818NRW1323 0819NRW0107 0819NRT0370 0819NRT1320 08196RT0411 08196RT0798 08196RT1338 | 08---9.4/9.9 | Enter onto SR-395 at La Mesa Road in the City of Victorville of San Bernardino County to construct street improvements, including signalization, as per plans date stamped September 28, 2017, by Caltrans District 8 Encroachment Permits Office and/or to the satisfaction of the Caltrans' Representa | SR-395, Victorville | 06/23/2021 | 1 (11/14/2018) | Details CEM-3701 Report |
1587 | Project ID: 1587 EFIS: 0000001155 Permit Numbers: 0409NMC2047 | 04-CC-4-0/0 | Do not process until you receive whole package from MT. Howard Reynolds. | SR-4 Median, Pittsburg | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
1784 | Project ID: 1784 EFIS: 0000001155 Permit Numbers: 04116DP0049 | 04-CC-4-20.45/29.66 | Do not process until you receive whole package from MT. Howard Reynolds. | SR-4 Median, Pittsburg | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
995086 | Project ID: 995086 DEA: 120U6804 EFIS: 1224000002 | 12-ORA-55,5,91-13.0,32,3.5 | Install and splice new fiber optic cables. Install and secure pull box to prevent vandalism and attempted wire theft. | SR-55 at Chapman, I-5 at 17th St., and SR-91 at Lemon Street | 1 (08/22/2023) | Details CEM-3701 Report | |
210197 | Project ID: 210197 Permit Numbers: 1213NGM0143 12146DP0750 | 12-ORA-55-2.02/2.4 | Perform contour grading of SR-55 median, construct 12 feet wide by 20 feet high monument structure in the median, landscape and hardscape in the median and northbound shoulder area between 19th Street and 250' S/O East Bay Street, and lighting enhancements at the monument sign structure in the C | SR-55, COSTA MESA | 12/31/2015 | 1 (02/02/2015) | Details CEM-3701 Report |
7018 | Project ID: 7018 EFIS: 0000001155 Permit Numbers: 1210NMC0509 | 12-ORA-57-17.3/17.3 | Perform median modification on Chapman Avenue from easterly to westerly of State boundary of SR-57. Median on easterly R/W is excluded from project. Modify traffic signal at NB and SB SR-57/Chapman Avenue On/Off-Ramps; replace inductive loops on EB Chapma | SR-57 FREEWAY, FULLERTON | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
209695 | Project ID: 209695 DEA: 08347704 EFIS: 0800000616 | 08-SBD-SR-58-0/12.9 | (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395. | SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395. | 01/14/2021 | 1 (12/01/2017) | Details CEM-3701 Report |
993159 | Project ID: 993159 DEA: 08323034 EFIS: 0812000059 COOP: 081703 | 08-RIV-60-18.8/19.6 | Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configuration | SR-60 & Moreno Beach Interchange | 2 (07/27/2021) | Details CEM-3701 Report | |
214677 | Project ID: 214677 DEA: 081F2604 EFIS: 0814000194 COOP: 081696 | 08-SBD-60-R7.83/R7.91 | The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb ramps | SR-60 and Archibald Avenue between East Oak Hill and Monticello Place | 08/19/2021 | 2 (01/30/2020) | Details CEM-3701 Report |