Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16261-16270 of 17291 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993496Project ID: 993496
Permit Numbers: 1020NMC0853 1021NRT0929 1022NRT0574
10---16.5Relocate and upgrade existing traffic signal poles, restripe traveled lanes, widen pavement and install curb.SR 5, Lathrop08/30/20231 (01/03/2022)Details CEM-3701 Report
993839Project ID: 993839
Permit Numbers: 1021NMC1168
10---17.554Modify the existing intersection of Lathrop Road.SR 5, Lathrop08/30/20231 (05/13/2022)Details CEM-3701 Report
10021Project ID: 10021
DEA: 100E4904
EFIS: 1000000024
COOP: 100308
Permit Numbers: 1012NMC0250 1012NDP0569
10-SJ-5-22/23.6Reconfigure the existing interchange to create a partial Type L-9 partial cloverleaf, widen the existing undercrossing structure, construct new loops on-ramps, and construct auxiliary lanes on I-5 from French Camp Road to Downing Avenue, and modify traffiSR 5, Stockton03/09/20201 (02/22/2013)Details CEM-3701 Report
213773Project ID: 213773
Permit Numbers: 1015NMC0093 1017NRT0103 1018NDP0719 1018NRT0689
10---29.8Install adaptive traffic signal system at the Interstate Route 5 interchange with March Lane in Stockton, as shown on the approved plans. The system will include the installation of Model 2070E traffic signal controller with GPS clocks and GPS antenna in existing controller cabinets, and replacemeSR 5, Stockton11/09/20211 (11/15/2018)Details CEM-3701 Report
209184Project ID: 209184
DEA: 031E2904
EFIS: 0300000258
Permit Numbers: 0313NMC0522
03-ED-US 50-1.02/2.4Construct New Silva Valley Parkway interchangeSR 50 between the El Dorado Hills Boulevard/Latrobe Road interchange and the Bass Lake Road interchange, just east of the Clarksville Undercrossing along the existing Sylva Valley Parkway12/05/20171 (12/19/2013)Details CEM-3701 Report
757Project ID: 757
Permit Numbers: 0306NSN0667
03-ED-50-6.4/6.6Signal-New / Modifysr 50 WB on/off ramp/cameron Park Dr., El Dorado Hills09/17/2014NOT VERIFIEDDetails CEM-3701 Report
209333Project ID: 209333
Permit Numbers: 06136DP0853 0613NMC0491
06-KER-58-50.61/50.61ADD CONTRACTORS TO THE CITY OF BAKERSFIELD PERMIT 0613-NMC-0491.Contractor Name Address Telephone Number Contact NameGranite Construction Company 3005 James RoadBakersfield, CA 93308 (661) 477-9774 Aaron YeomansPavement Recycling Systems P. O. Box 1266RivSR 58, Bakersfield08/27/20181 (12/22/2014)Details CEM-3701 Report
213916Project ID: 213916
DEA: 06484664
EFIS: 0618000213
COOP: 061681
06-KER-58,99-R52.1/R52.5RT 58/99 BAKERSFIELD FREEWAY CONNECTOR -widening the existing SR 58/SR 99 grade separation structure and realigning the Westbound to Southbound loop connector. Auxiliary lane and collector-distributor lanes on Southbound SR 99.SR 58/SR 99 2 (03/12/2021)Details CEM-3701 Report
211132Project ID: 211132
Permit Numbers: 10156MC0300
10-SJ-580-13.4Install new traffic signals at Interstate 580/Patterson Pass Road Intersection and Interstate 580/Mountain House Parkway intersection in the City of Tracy. Work includes right turn lane and approach taper at I-580/Patterson Pass Road eastbound onramp and shoulder widening on I-580/Mountain House PaSR 580, Tracy 1 (01/22/2016)Details CEM-3701 Report
210846Project ID: 210846
DEA: 044H1504
EFIS: 0413000105
Permit Numbers: 0414NMC2543 04156DP1531
04-SM-82-6.1/6.1The project will upgrades sidewalk,crosswalk,median,landscaping,lighting and pedestrian signal along El Camino Real (Route 82)from 500' north of and 200' south of Arroyo Ave in the Cityt of San Carlos.SR 82 (El Camino Real), San Carlos08/22/20181 (10/01/2015)Details CEM-3701 Report