Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16181-16190 of 17845 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
208950 | Project ID: 208950 DEA: 032F9704 EFIS: 0312000025 | 03-COL-20-28.2/30.5 | SUPERPAVE HOT MIX ASPHALT OVERLAY | COLUSA COUNTY NEAR COLUSA FROM 0.3 MILE WEST OF POWELL SLOUGH BRIDGE TO S10C STREET | 02/06/2015 | 1 (01/15/2014) | Details CEM-3701 Report |
211005 | Project ID: 211005 DEA: 060U9004 EFIS: 0616000082 | 06-KER-5-NB 5.6/6.2, SB 7.5/8.2, VAR, NB 5.6/6.2, SB 7.2/8.2 | Supplemental funds to repair/maintain mudslide | Near Lebec, | 08/02/2023 | 1 (01/17/2019) | Details CEM-3701 Report |
2092 | Project ID: 2092 DEA: 04272024 | 04-SCl-280-5.1/7.8 | SURFACE EXISTING HIGWAY AND TREAT BRIDGE DECKS | In Santa Clara County from Cypress Ave Pedestrian Overcrossing to Tantau Ave Overcrossing | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
4026 | Project ID: 4026 DEA: 07246704 | 07-LA-110- 22.0/ 23.2 | SURFACE IMPROVE TO MEDIAN/ISLAND | 08/25/2010 | 1 (08/26/2010) | Details CEM-3701 Report | |
5622 | Project ID: 5622 DEA: 100M3104 | 10-SJ-580-8.1/14.5 | Surfacing existing freeway with rubberized AC (Type G) | 01/19/2011 | 1 (01/19/2011) | Details CEM-3701 Report | |
6509 | Project ID: 6509 DEA: 120E0804 Permit Numbers: 1207NMC0258 | 12-ORA-405-11.0/11.2 | SUSAN STREET OFFRAMP OVERHEAD SIGN | 07/28/2010 | NOT VERIFIED | Details CEM-3701 Report | |
7786 | Project ID: 7786 DEA: 031A43A4 EFIS: 0313000005 | 03-SUT-99-10.9/14.7 | Sutter 99 Feather River Bridge : Widen to provide four lane segment | SUTTER COUNTY NEAR NICOLAUS FROM POWER LINE ROAD TO 0.1 MILE SOUTH OF LAUREL AVENUE | 11/30/2017 | 1 (10/02/2012) | Details CEM-3701 Report |
212535 | Project ID: 212535 DEA: 031A9204 EFIS: 0300020608 | 03-SUT-20-5-11.3 | SUTTER BYPASS WIDENING AND REHAB | NEAR YUBA CITY FROM SUTTER BYPASS TO 0.1 MILE WEST OF LYTLE ROAD. | 12/01/2021 | 1 (07/23/2018) | Details CEM-3701 Report |
214134 | Project ID: 214134 Permit Numbers: 0519NCS0156 05196DP0549 0519NRT0813 0519NRT0814 0519NRT0812 | 05---25.267 | Sycamore Drive Pedestrian Improvements Project, which includes ADA curb ramps and sidewalk, new curb and gutter, slurry seal and a new crosswalk. | Highway 246, Buellton | 10/29/2020 | 1 (09/30/2019) | Details CEM-3701 Report |
994287 | Project ID: 994287 DEA: 044G08A4 EFIS: 0421000306 COOP: 042891 | 04-SOL-I-80,I-505- | SYSTEM INTEGRATION OF MANAGED LANES | WESTBOUND AND EASTBOUND INTERSTATE 80 (I-80) FROM WEST OF RED TOP ROAD TO EAST OF INTERSTATE 505 (I-505) IN SOLANO COUNTY | 2 (09/23/2022) | Details CEM-3701 Report |