Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16161-16170 of 17770 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
209987 | Project ID: 209987 Permit Numbers: 0413NMC1846 | 04-ALA-123-0.1/0.4 | The project is funded by a Safe routes to Transit grant to improve mobility for bicyclists and pedestrians at the intersections of Pablo Ave/40th Street and San Pablo Ave./Adeline Street/W. Macarthur Blvd. | San Pablo Ave, Emeryville | 10/22/2019 | 1 (10/08/2014) | Details CEM-3701 Report |
209231 | Project ID: 209231 Permit Numbers: 04136DP2246 04126MC1991 | 04-NAP-121-6.25/6.4 | The project is proposing a new commercial center at corner of Kansas Ave and Soscol Ave (State Route 121)within the City of Napa. | 300 Soscol Ave, Napa | 09/14/2018 | 1 (12/10/2013) | Details CEM-3701 Report |
993657 | Project ID: 993657 Permit Numbers: 04206MC2436 04216RW0994 04216RT1806 04216RW3013 04216RT3202 04226RT0391 04216RW1010 04216RW3271 04226RT0861 | 04---7.52 | The project proposed to replace existing curb,gutter,and sidewalk along the frontage of the project on El Camino Real. | 1300 El Camino Real, Belmont | 1 (03/23/2022) | Details CEM-3701 Report | |
213506 | Project ID: 213506 Permit Numbers: 0417NOP2721 | 04-SM-82-20.9/21.6 | The project proposes sidewalk, crosswalk, median, landscaping and pedestrian signal upgrades along El Camino Real from 250' south of Kaiser Way to McLellan Drive in the City of South San Francisco. The median will be re-landscaped with trees along Route 82, widened to a minimum of 6' to prov | Route 82, South San Francisco | 11/30/00-1 | 1 (11/08/2019) | Details CEM-3701 Report |
212383 | Project ID: 212383 Permit Numbers: 0414NMC0120 04166RT0398 0417NRT0222 04176DP0198 0417NRD0267 04166RT0398 | 04-SCL-9-8.8/10.3 | The project proposes to construct an ADA compliant asphalt concrete pedestrian path at locations along HWY 9 to enhance pedestrian travel and safety. | HWY 9, Saratoga | 02/03/2020 | 1 (05/09/2017) | Details CEM-3701 Report |
213954 | Project ID: 213954 DEA: 044K0804 EFIS: 0417000257 Permit Numbers: 0418NOP2083 | 04---26 | The project proposes to improve the intersections of Marsh Road (SR-84)at Constitution drive and Marsh Rd. (SR-84)at Bayfront Expressway (SR-84). | Marsh Road, Menlo Park | 04/02/2021 | 1 (03/29/2019) | Details CEM-3701 Report |
211184 | Project ID: 211184 Permit Numbers: 04156DP2126 04146RC1249 04156RT1737 | 04-SON-116-24.9/24.9 | The project proposes to install a new driveway connecting the property to Gravenstein Highway (HWY. 116 South). | 1270 Gravenstein HWY. North, Sebastopol | 01/21/2019 | 1 (02/09/2016) | Details CEM-3701 Report |
215737 | Project ID: 215737 Permit Numbers: 0418NOP1441 0420NRT2951 0420NRT2952 | 04---11.2/15.5 | The project proposes widening the inside median of SR4 in both directions from east of Milano Way/Glacier Drive to east of SR242.Widen State Route 4 from inside median in both direction from east of Milano/Glacier Drive to State Route 242, outside widening of State Route 4 of both directions from P | SR 4/680 Interchange and SR4 widening , Martinez and Concord | 1 (10/07/2024) | Details CEM-3701 Report | |
7013 | Project ID: 7013 EFIS: 0000001155 Permit Numbers: 0410NMC1368 | 04-CC-4- | The project provides for the re-engineering of Bailey Road to provide wider sidewalks and Class II bicycle facilities along both sides of bailey Road. | Bailey Road in Pittsburg, CA | 08/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
215462 | Project ID: 215462 DEA: 080C8704 EFIS: 0800000064 COOP: 081687 | 08-SBD-SR 60-R2.08/2.80 | The project scope of work is widening approximately .7 miles of SR-60 at Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions | Project Limits are SR-60 from 0.3 miles west to 0.4 miles east of Central Ave. PM 2.08/2.80 in Chino. | 2 (01/18/2021) | Details CEM-3701 Report |