Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16091-16100 of 16334 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994724 | Project ID: 994724 DEA: 010M0804 EFIS: 0122000084 | 01-HUM-255-0.5/8.6 | MICROSURFACING, REPLACE AC SURFACING, AND MODIFY SIGNAL SYSTEMS. | HUMBOLDT COUNTY IN EUREKA FROM 0.3 MILE NORTH OF EUREKA CHANNEL BRIDGE TO G STREET IN ARCATA | 1 (04/25/2023) | Details Personnel CEM-3701 Report | |
994725 | Project ID: 994725 DEA: 010M1104 EFIS: 0122000095 | 01-MEN-20-34.4/R38.5 | REPLACE ASPHALT CONCRETE SURFACING, GEOSYNTHETIC PAVEMENT INTERLAYER. | MENDOCINO COUNTY FROM 1.2 MILES EAST OF THE ROUTE 20/101 SEPARATION TO 0.2 MILE EAST OF COLD CREEK BRIDGE #2 | 1 (04/25/2023) | Details Personnel CEM-3701 Report | |
994727 | Project ID: 994727 DEA: 031J2604 EFIS: 0320000184 | 03-NEV-80-16.3/18.8 | GRIND CONCRETE, PLACE POLYESTER CONCRETE INLAY, AND RESTRIPE. | NEVADA COUNTY IN TRUCKEE FROM 0.3 MILE WEST OF 80/267/89N SEPARATION TO 0.5 MILE EAST OF POLARIS UNDERCROSSING | 1 (05/15/2023) | Details Personnel CEM-3701 Report | |
994728 | Project ID: 994728 DEA: 032J8104 EFIS: 0322000102 | 03-BUT-99-R30.6,R31.5 | CONSTRUCT SLOPE PAVING AND INSTALL AESTHETIC FEATURE. | BUTTE COUNTY IN CHICO AT SKYWAY OVERCROSSING AND AT EAST 20TH STREET OVERCROSSING | 1 (05/15/2023) | Details Personnel CEM-3701 Report | |
994729 | Project ID: 994729 DEA: 034H88U4 EFIS: 0323000024 | 03-BUT-32-0.3/5.0 | INSTALL LIGHTING, WIDEN SHLD, UPGRADE END TREATMENTS, EXTEND CULVERTS. | BUTTE COUNTY NEAR CHICO FROM 0.3 MILE EAST OF BUTTE COUNTY LINE TO MUIR AVENUE | 1 (05/15/2023) | Details Personnel CEM-3701 Report | |
994730 | Project ID: 994730 DEA: 040Y1904 EFIS: 0422000255 | 04-SOL-37-R0.0/R7.4 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. | SOLANO COUNTY IN AND NEAR VALLEJO FROM SONOMA COUNTY LINE TO NAPA RIVER BRIDGE | 1 (05/10/2023) | Details Personnel CEM-3701 Report | |
994731 | Project ID: 994731 DEA: 040Y3004 EFIS: 0422000265 | 04-SM-92-R10.4/R12.0 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. | SAN MATEO COUNTY IN AND NEAR SAN MATEO FROM 0.2 MILE WEST OF ALAMEDA DE LAS PULGAS OVERCROSSING TO 92/101 SEPARATION | 1 (05/09/2023) | Details Personnel CEM-3701 Report | |
994732 | Project ID: 994732 DEA: 043Q5004 EFIS: 0419000218 | 04-ALA-580,980-Var | POLYESTER CONCRETE OVERLAY, HMA (TYPE A), & SOIL DENSIFICATION. | ALAMEDA COUNTY AT VARIOUS LOCATIONS | 1 (05/10/2023) | Details Personnel CEM-3701 Report | |
994741 | Project ID: 994741 DEA: 051P4204 EFIS: 0522000040 MINOR: 05A2434 | 05--- | 1 (05/03/2023) | Details Personnel CEM-3701 Report | |||
994742 | Project ID: 994742 DEA: 012983U4 EFIS: 0119000062 | 01-LAK-29-28.5/31.6 | New Highway Planting | Lak-29 Expressway Mitigation | 1 (05/22/2023) | Details Personnel CEM-3701 Report |