Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16021-16030 of 17630 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214271 | Project ID: 214271 DEA: 120R4505 EFIS: 1218000095 MINOR: 12A1791 | 12-ORA-91-17.8 | Replace panel on existing CMS #37 | 07/02/2024 | 1 (11/23/2020) | Details CEM-3701 Report | |
214272 | Project ID: 214272 DEA: 101L1504 EFIS: 1019000196 | 10-ALP-89-21.47, 21.46 | 01/05/2023 | 1 (08/02/2019) | Details CEM-3701 Report | ||
214273 | Project ID: 214273 DEA: 051M1804 EFIS: 0519000078 | 05-SLO-41-11.5/11.5, 11.50 | Major Damage Restoration (Emergency Opening) | 09/23/2022 | 1 (09/30/2019) | Details CEM-3701 Report | |
214274 | Project ID: 214274 DEA: 010J7304 EFIS: 0119000082 MINOR: 01A2002 | 01-MEN-1-18.0/23.0, 18.0-23.0 | 11/17/2020 | 1 (09/30/2019) | Details CEM-3701 Report | ||
214283 | Project ID: 214283 DEA: 044Q0304 EFIS: 0419000306 | 04-SON-1-11.2, 11.20 | REPLACE FAILED 60" CMP CULVERT WITH 10'x10' PRECAST REINFORCED CONCRETE BOX | 06/20/2022 | 1 (08/19/2019) | Details CEM-3701 Report | |
214288 | Project ID: 214288 DEA: 034H6804 EFIS: 0319000022 MINOR: 03A2927 | 03-PLA-65-10.5/10.7 | Whitney Ranch Fence | 07/22/2021 | 1 (10/23/2019) | Details CEM-3701 Report | |
214294 | Project ID: 214294 DEA: 07301904 EFIS: 0714000030 | 07-LA-210-R33.1/R44.01 | FOR CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM MONTEREY AVENUE UNDERCROSSING TO ROUTE 57/210 SEPARATION | 01/20/2022 | 1 (01/29/2020) | Details CEM-3701 Report | |
214298 | Project ID: 214298 DEA: 07311504 EFIS: 0715000012 | 07-VEN-126-R10.2/R12.7 | FOR CONSTRUCTION ON STATE HIGHWAY IN VENTURA COUNTY IN SANTA PAULA FROM 0.2 MILES WEST OF PECK ROAD OVERCROSSING TO SANTA PAULA CREEK | 03/01/2024 | 1 (03/06/2020) | Details CEM-3701 Report | |
214315 | Project ID: 214315 DEA: 081G2104 EFIS: 0815000170 | 08-SBD-210 - 15,210-7.4/9.0, 10.5/12.7 | Install lighting and ramp metering systems. | 09/15/2021 | 1 (12/10/2019) | Details CEM-3701 Report | |
214328 | Project ID: 214328 DEA: 060W6904 EFIS: 0617000282 | 06-KER-223-1.8/R10.9, 23.5/25.5, 27.7/29.7 | 02/29/2024 | 1 (08/20/2019) | Details CEM-3701 Report |