Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15991-16000 of 16333 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993307 | Project ID: 993307 Permit Numbers: 0421NDP2901 | 04---40.4/41 | US-101/ De La Cruz Boulevard interchange improvement.Re-construct the US 10 I /De La Cruz Boulevard/ Trimble Road Interchange to improve traffic operations and connectivity for pedestrians and bicyclists. Work includes:i) Replacement of the existing De La Cruz Boulevard bridge overcrossing with an | US 101/ De La Cruz , San Jose | NOT VERIFIED | Details Personnel CEM-3701 Report | |
993308 | Project ID: 993308 Permit Numbers: 0421NOP2843 | 04---40.4/41 | US-101/ De La Cruz Boulevard interchange improvement. | US 101/ De La Cruz , San Jose | NOT VERIFIED | Details Personnel CEM-3701 Report | |
210439 | Project ID: 210439 DEA: 041G6204 EFIS: 0415000236 COOP: 042578 | 04-SM-101-8.1/8.6 | Improvements to US 101/Holly Street Interchange | US 101/Holly Street Interchange in San Mateo County | 2 (10/26/2015) | Details Personnel CEM-3701 Report | |
213132 | Project ID: 213132 DEA: 03372814 EFIS: 0314000301 Permit Numbers: 0317AOP0994 0318ADP0096 | 03-ED-50-16/16.6 | Western Placerville Interchanges Project Phase 2. Construction of EB auxiliary lane Forni Road, EB off ramp at Ray Lawyer Drive, a storm water detention basin and a signalized intersection at Ray Lawyer Drive. | US 50, Placerville | 07/27/2020 | 2 (02/16/2018) | Details Personnel CEM-3701 Report |
2508 | Project ID: 2508 Permit Numbers: 05086DP0450 | 05-SB-101,217-Various | Install Santa Barbara Airport guide signs. RELATED PERMIT: 05-07-N-MC-0631 | US Highway 101 and State Route 217 | 09/17/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |
1765 | Project ID: 1765 EFIS: 0000001155 Permit Numbers: 0410NMC0628 | 04-MRN-101-18.6/19.1 | Construction of class 1 bike path 3,200 in length. | US Highway 101, Novato | 01/21/2019 | NOT VERIFIED | Details Personnel CEM-3701 Report |
213884 | Project ID: 213884 DEA: 051F1004 EFIS: 0513000057 Permit Numbers: 0519NOP0704 0520NDP0091 | 05---82.18/-1 | Re-align on and off-ramps at NB interchange. Signalize the intersection, revise pavement delineation and markings on Clark Avenue, minor pavement rehabilitation, guardrail replacement and widening at southbound off-ramp.Construct interchange improvements at US Highway 101 and Clark Avenue accordin | US Highway 101, Orcutt unincorporated | 08/17/2022 | 1 (02/18/2020) | Details Personnel CEM-3701 Report |
209582 | Project ID: 209582 Permit Numbers: 0814AOP0302 0815ARW0292 0815ARD0322 0816ART0264 0817ART0270 | 08-SBD-395-12.1/12.8 | Enter onto SR-395, north of Victor Street to Mojave Drive, in the City of Adelanto to construct street improvements including: replacing pavement, construction of curb & gutter, drainage inlet, sidewalk, ramps, driveways, AC trapezoidal channel, storm drain pipe, relocation/adjustment of existi | US Highway 395, Adelanto | 07/31/2018 | 1 (10/26/2017) | Details Personnel CEM-3701 Report |
209284 | Project ID: 209284 DEA: 032F21U3 EFIS: 0313000172 COOP: 03130001724 | 03-SAC-50-2.5/0.6 | NOTIFY SMR BEFORE RESPONDING TO ANY REQUESTS FOR INSPECTION OR TESTING.The Design Build project will place overlay, replace bridge joint seals and/or joint seal assemblies, and correct drainage issues on Sacramento River Viaduct and West End Viaduct. | US Route 50 from PM 2.5 in Yolo County through PM 0.6 in Sacramento County; Route I-5 from | 03/22/2016 | 1 (01/16/2014) | Details Personnel CEM-3701 Report |
2638 | Project ID: 2638 DEA: 050L6904 | 05-SLO-101-32.5 | US-101 North of Reservoir Canyon Road | 07/01/2011 | 1 (03/16/2007) | Details Personnel CEM-3701 Report |