Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15971-15980 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
210183 | Project ID: 210183 Permit Numbers: 04146DP2269 0413NMC2337 | 04-SM-101-3.5/3.5 | The proposed project will include widening the northbound off-ramp on the western side of the approach to accommodate an additional right-turn lane. | Route 101, Menlo Park | 09/14/2018 | 1 (02/06/2015) | Details CEM-3701 Report |
213625 | Project ID: 213625 DEA: 11428504 EFIS: 1117000090 COOP: 118435 Permit Numbers: 11176DP0844 | 11-SD-75-12.65-13.15 | The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53 | SR-75 and Hooper Boulevard Intersection | 2 (09/12/2018) | Details CEM-3701 Report | |
993108 | Project ID: 993108 Permit Numbers: 0421NMC2009 | 04---47.7/47.9 | The proposed widening of the NB 101 off-ramp at Moffett Blvd includes the following improvements within Caltrans right-of-way; constructing an additional NB right-turn lane, replacement MVP, and sidewalk and curb ramp, concrete barrier installation, modification of traffic signal and detector loops | Northbound Off-Ramp at Moffett Blvd, Mountain View | 03/27/2023 | 1 (07/16/2021) | Details CEM-3701 Report |
6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
214924 | Project ID: 214924 DEA: 080M9004 EFIS: 0812000248 COOP: 081695 | 08-RIV-111-18.0/19.0 | The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca. | The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. | 2 (04/22/2020) | Details CEM-3701 Report | |
210469 | Project ID: 210469 DEA: 042J1504 EFIS: 0414000432 | 04-CC-4,80,580,680-Var | THE REPLACEMENT OF OVERHEAD SIGNS WITH HIGH-PERFORMANCE REFLECTIVE SIGNS, REMOVAL OF EXISTING SIGNAGE LIGHTING, AND REMOVAL OF GANTRY CATWALKS ON SIGN-GANTRY STRUCTURES, WITHIN VARIOUS COUNTIES | IN CONTRA COSTA COUNTY AT VARIOUS LOCATIONS | 12/21/2017 | 1 (03/20/2017) | Details CEM-3701 Report |
209466 | Project ID: 209466 DEA: 041J6504 EFIS: 0414000313 | 04-SOL-84-12.09 | The required temporary repairs include replacing deteriorated timber planks and stringers, placing corrugated metal over the existing timber deck system, and replacing asphalt concrete surfacing. | Near Rio Vista at the Miner Slough Bridge | 05/26/2016 | 1 (03/31/2014) | Details CEM-3701 Report |
8159 | Project ID: 8159 Permit Numbers: 0412NMC0383 04136DP0013 0413NRW0185 | 04-ALA-123-4.4/4.43 | The San Pablo and Marin Avenue intersection consists of the following improvements:1. ADA compliant curb ramps.2. High visibility crosswalk in all four reaches of the intersection.3. Modified signal timing and equipment for eastbound bike/ped phase.4. Add | San Pablo Avenue , Albany | 10/21/2014 | 1 (11/28/2012) | Details CEM-3701 Report |
214677 | Project ID: 214677 DEA: 081F2604 EFIS: 0814000194 COOP: 081696 | 08-SBD-60-R7.83/R7.91 | The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb ramps | SR-60 and Archibald Avenue between East Oak Hill and Monticello Place | 08/19/2021 | 2 (01/30/2020) | Details CEM-3701 Report |
210489 | Project ID: 210489 DEA: 080F6314 EFIS: 0813000220 | 08-SBD-395-11.2/16.6 | The scope of project is widening approximately 5 miles of US 395 from two lanes to four lanes, repave existing lanes, modify five signals, upgrade ADA access, add turn lanes, add sound walls, and extend bridge | Project Limits are PM 11.2 from 16.6 and US 395. | 08/19/2021 | 2 (01/03/2019) | Details CEM-3701 Report |