Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15821-15830 of 18128 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
992 | Project ID: 992 DEA: 032E0104 EFIS: 0300000315 MINOR: 03A1460 | 03-SAC-50-21.4 | INSTALL PERFORATED METAL PIPE (UNDERDRAIN) AT SCOTT ROAD INTERCHANGE | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
1003 | Project ID: 1003 DEA: 032E2504 | 03-NEV-49-2.1/13.1 | INSTALL RUMBLE STRIPS | 10/21/2010 | NOT VERIFIED | Details CEM-3701 Report | |
1066 | Project ID: 1066 DEA: 032M8304 EFIS: 0300000391 MINOR: 03A1468 | 03-GLE-5-14.6 | REMOVE TREES AT WILLOWS SAFETY ROADSIDE REST AREAS | 12/18/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
1084 | Project ID: 1084 DEA: 03349904 EFIS: 0300000410 Permit Numbers: 0306NMC0947 0306NMC0947 | 03-PLA-80-11.17/12.55 | IN ROCKLIN SIERRA COLLEGE BLVD. OVERCROSSING IMPROVEMENTS | Sierra College, Rocklin | 09/17/2014 | 2 (11/21/2014) | Details CEM-3701 Report |
1086 | Project ID: 1086 DEA: 033555U4 | 03-ED-49,50-VAR | HIGHWAY WIDENING & BRIDGES, RAILING, BARRIERS, SIGNS & LIGHTING | El Dorado County in Placerville on Route 50 from 0.2 km West of West Placerville Undercrossing to Clay St. Undercrossing & on Route 49 at Hangtown Creek. | 12/30/2009 | NOT VERIFIED | Details CEM-3701 Report |
1091 | Project ID: 1091 DEA: 03368804 EFIS: 0300000422 Permit Numbers: 0309NMC0489 | 03-BUT-20-30.18/31.01 | City of Chico (Rte 20, Skyway) | 12/18/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
1092 | Project ID: 1092 DEA: 03369304 EFIS: 0300000423 Permit Numbers: 0310NMC0279 | 03-YOL-5-5.0/5.7 | I-5/CR-102 Interchange Improvements | CITY OF WOODLAND HP21L-5046(032) | 12/18/2017 | 2 (11/21/2014) | Details CEM-3701 Report |
1093 | Project ID: 1093 DEA: 03370004 EFIS: 0300000424 | 03-ED-50-15.1/15.2 | MISSOURI FLAT ROAD OVERCROSSING PHASE 1A | 07/12/2019 | 2 (11/21/2014) | Details CEM-3701 Report | |
1101 | Project ID: 1101 DEA: 033A0404 EFIS: 0300000442 | 03-BUT-99-R032.4/R033.3 | CONSTRUCT AUX LANES, IMPROVE RAMPS EAST 1ST AVE OVERCROSSING | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
1104 | Project ID: 1104 DEA: 033A2704 EFIS: 0300000447 COOP: 032450 Permit Numbers: 0309NMC0202 | 03-BUT-99-004.1/004.7 | WIDEN TO 5 LNS, INST SIGNAL, CURB SIDEWALK, GUTTER, STORM DRAIN SYSTEM IN GRIDLEY | 12/21/2017 | 2 (11/21/2014) | Details CEM-3701 Report |