Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15791-15800 of 17710 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214337 | Project ID: 214337 DEA: 080E33U4 EFIS: 0817000075 | 08-SBD-115-R7.3/R10.0 | ADD WB AUX & EB DECEL LANES, WIDEN I15 SW CONNECT,RAMPS/BRDG | SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE | 1 (06/23/2021) | Details CEM-3701 Report | |
213182 | Project ID: 213182 DEA: 030C4724 EFIS: 0314000272 | 03-YOL-16-20.5/21.3, 28.2/31.8 | ADD TURN LANES & ROUNDABOUT, ALIGN CURVE, WIDEN SHOULDER, CULVERT WORK | YOLO COUNTY NEAR ESPARTO FROM 0.3 MILE WEST TO 0.4 MILE EAST OF COUNTY ROAD 79 AND FROM 0.1 MILE EAST OF PLAINFIELD STREET TO 0.1 MILE EAST OF COUNTY ROAD 90 | 10/06/2021 | 1 (07/26/2018) | Details CEM-3701 Report |
3639 | Project ID: 3639 EFIS: 0000001155 Permit Numbers: 0707NSN1748 07086DP1742 | 07-LA-1-39.326 | ADD TRAFFIC SIGNAL PHASE AT SUNSET BLVD | 08/24/2012 | NOT VERIFIED | Details CEM-3701 Report | |
629 | Project ID: 629 DEA: 023C2904 | 02-TEH-36-L041.0/L000.0 | ADD SIGNAL AT INTERSECTION | 12/23/2010 | 1 (09/20/2007) | Details CEM-3701 Report | |
4895 | Project ID: 4895 DEA: 080F7704 | 08-SBd-15-6.7 | ADD SIDEWALK,CURBS,CURB RAMPS ,CROSS GUTTER AND COLD PLANE | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4847 | Project ID: 4847 DEA: 080E1104 | 08-SBd-62-R29.2/29.8 | ADD SHOULDER, COLD PLANE , CONSTRUCT HMA DIKE | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
1000256 | Project ID: 1000256 DEA: 120S2804 EFIS: 1220000014 | 12-ORA-5-9.6/10.4 | ADD SECONDARY AUXILIARY LANE. | ORANGE COUNTY IN SAN JUAN CAPISTRANO FROM ROUTE 74/5 SEPARATION TO 0.5 MILE SOUTH OF JUNIPERO SERRA ROAD UNDERCROSSING | 1 (05/14/2024) | Details CEM-3701 Report | |
214440 | Project ID: 214440 DEA: 120R6504 EFIS: 1219000012 MINOR: 12A1796 | 12-ORA-5,405-22.5 | Add Safety Lighting, install new chevronong and pavement markings and refreshing all existing striping and markings at the ramp intersection and through the whole ramp. | Enhance Safety on SB Rte 5 Alton Onramp in the City of Irving | 07/02/2024 | 1 (10/21/2019) | Details CEM-3701 Report |
6780 | Project ID: 6780 DEA: 120K8804 EFIS: 1200000374 MINOR: 12A1286 | 12-ORA-55-3.6 | Add Safety Lighting and Pavement Striping | In Costa Mesa, Route 55 SB at Fair Drive On-Ramp | 09/28/2012 | NOT VERIFIED | Details CEM-3701 Report |
6782 | Project ID: 6782 DEA: 120K9504 EFIS: 1200000377 MINOR: 12A1291 | 12-ORA-5-18.537 | Add Safety Lighting and Install Rubber Pad(Raised Truncated Domed Pattern) on existing curb ramps | SB I5 and El Toto | 09/28/2012 | 2 (01/01/2011) | Details CEM-3701 Report |