Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15711-15720 of 17636 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2659 | Project ID: 2659 DEA: 050M14V4 EFIS: 0500000804 | 05-SB-101-26.5/27.1 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | SANTA BARBARA COUNTY IN GOLETA FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF CATHEDRAL OAKS ROAD OVERCROSSING | 08/13/2018 | 1 (09/26/2011) | Details CEM-3701 Report |
994245 | Project ID: 994245 DEA: 051H4304 EFIS: 0516000073 | 05-SB-101-21.4/21.9 | San Jose Creek Bridge replacement | SANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE | 1 (09/19/2022) | Details CEM-3701 Report | |
6882 | Project ID: 6882 DEA: 050T9104 | 05-SB-1-22.5 | CLEAN AND PAINT EXISTING STEEL BRIDGE | SANTA BARBARA COUNTY IN LOMPOC AT THE SANTA YNEZ RIVER BRIDGE | 11/28/2012 | 1 (11/28/2012) | Details CEM-3701 Report |
993718 | Project ID: 993718 DEA: 051H0104 EFIS: 0516000012 | 05-SB-1,246-19.3/20.6,8.3/9.5 | PLACE HMA, CURB RAMPS AND MODIFY SIGNAL AND LIGHTING SYSTEMS. | SANTA BARBARA COUNTY IN LOMPOC ON ROUTE 246 FROM 0.3 MILE WEST OF V STREET TO WEST JUNCTION ROUTE 1/246 AND ON ROUTE 1 FROM WEST JUNCTION ROUTE 1/246 TO EAST JUNCTION ROUTE 1/246 | 01/11/2024 | 1 (04/19/2022) | Details CEM-3701 Report |
215822 | Project ID: 215822 DEA: 051E0404 EFIS: 0513000027 | 05-SB-101-11.0 | AT THE PEDESTRIAN UC, CONSTRUCT RAMPS, SIDEWALKS AND RETAINING WALL. | SANTA BARBARA COUNTY IN SANTA BARBARA AT BUTTERFLY LANE UNDERPASS | 08/23/2023 | 1 (07/26/2021) | Details CEM-3701 Report |
210343 | Project ID: 210343 DEA: 051F6104 EFIS: 0514000037 | 05-SB-101-R14.2 | COLD PLANE PAVEMENT AND INSTALL CONCRETE PAVERS IN ROADBED. | SANTA BARBARA COUNTY IN SANTA BARBARA AT CASTILLO STREET UNDERCROSSING | 06/16/2016 | 1 (06/15/2015) | Details CEM-3701 Report |
2587 | Project ID: 2587 DEA: 050J3204 EFIS: 0500000093 | 05-SB-101-R15.8 | UPGRADE PUMPING PLANT BY REPLACING EQUIPMENT AND ADDING CONTROL ROOM. | SANTA BARBARA COUNTY IN SANTA BARBARA AT MISSION STREET UNDERCROSSING | 01/17/2014 | 1 (05/22/2012) | Details CEM-3701 Report |
213599 | Project ID: 213599 DEA: 051H2904 EFIS: 0516000058 | 05-SB-101-13.8/R14.8 | UPGRADE PUMPING PLANTS AT 3 LOCATIONS. | SANTA BARBARA COUNTY IN SANTA BARBARA AT VARIOUS LOCATIONS FROM STATE STREET UNDERCROSSING TO CARRILLO STREET UNDERCROSSING | 05/29/2020 | 1 (08/20/2019) | Details CEM-3701 Report |
2966 | Project ID: 2966 DEA: 05447814 EFIS: 0500000540 | 05-SB-101-10.8/12.8 | Planting and irrigation for landscape mitigation. | SANTA BARBARA COUNTY IN SANTA BARBARA FROM 0.3 MILE WEST OF OLIVE MILL ROAD OVERCROSSING TO MILPAS STREET UNDERCROSSING | 08/22/2018 | 1 (09/23/2010) | Details CEM-3701 Report |
215454 | Project ID: 215454 DEA: 051N0804 EFIS: 0520000123 | 05-SB-144-0.9/2.0 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | SANTA BARBARA COUNTY IN SANTA BARBARA FROM ALAMEDA PADRE SERRA TO ROUTE 192 | 11/15/2021 | 1 (03/12/2021) | Details CEM-3701 Report |