Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15691-15700 of 17838 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212419 | Project ID: 212419 DEA: 033H2404 EFIS: 0317000264 | 03-ED-50-48.8/49.0 | Abandon culvert and place new culvert | 05/04/2021 | 1 (09/18/2017) | Details CEM-3701 Report | |
212420 | Project ID: 212420 DEA: 033H0704 EFIS: 0317000224 | 03-ED-193-19.8/26.95 | Remove mudslides, repair sipouts and drainage, and lay back slopes | 08/06/2019 | 1 (09/18/2017) | Details CEM-3701 Report | |
212421 | Project ID: 212421 DEA: 033H2304 EFIS: 0317000245 | 03-ED-50-33.9,36.2 | Grind and pave HMA-A and geotechnical drilling | 01/02/2019 | 1 (09/18/2017) | Details CEM-3701 Report | |
212428 | Project ID: 212428 DEA: 051H9504 EFIS: 0517000038 | 05-SBT-101-R14.2 | Remove conrete pavers and install geosynthetic sheet drain with PCC overlay | 08/27/2018 | 1 (05/11/2017) | Details CEM-3701 Report | |
212430 | Project ID: 212430 DEA: 044K6504 EFIS: 0417000331 | 04-SOL-12-7.4/17.1 | AC digouts | 08/27/2018 | 1 (08/27/2018) | Details CEM-3701 Report | |
212431 | Project ID: 212431 DEA: 044K9404 EFIS: 0417000374 | 04-SOL-113-4.0/17.0 | AC digouts | 08/27/2018 | 1 (08/27/2018) | Details CEM-3701 Report | |
212432 | Project ID: 212432 DEA: 040P1804 | 04-SON-12-17.6/18.5 | Repair AC pavement | 01/16/2019 | NOT VERIFIED | Details CEM-3701 Report | |
212433 | Project ID: 212433 DEA: 044K6204 EFIS: 0417000328 | 04-SCL,SCI-152-7.9/9.4 | AC planing and overlay | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report | |
212434 | Project ID: 212434 DEA: 044K5604 EFIS: 0417000322 | 04-ALA-185-0.4/3.2 | HM 1 - AC planing and overlay | 08/08/2018 | NOT VERIFIED | Details CEM-3701 Report | |
212435 | Project ID: 212435 DEA: 044K6104 EFIS: 0417000327 | 04-CC-80-10.7/13.0 | HM 1 - Replace and repair PCC slabs | 08/21/2018 | NOT VERIFIED | Details CEM-3701 Report |