Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15671-15680 of 17771 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214766 | Project ID: 214766 DEA: 042Q1004 EFIS: 0418000396 | 04-SM-280-10.8/M27.4 | REPLACE PAVEMENT DELINEATION. | SAN MATEO COUNTY FROM ROUTE 280/92 SEPARATION TO SAINT CHARLES AVENUE OVERCROSSING | 01/04/2021 | 1 (07/02/2020) | Details CEM-3701 Report |
994051 | Project ID: 994051 DEA: 041Q5814 EFIS: 0421000262 | 04-SM-101-0.0-6.5 | REHABILITATE PAVEMENT AND UPGRADE MEDIAN BARRIER [PS&E E-COPY AVAILABLE UPON REQUEST] | SAN MATEO COUNTY FROM SAN MATEO COUNTY LINE IN EAST PALO ALTO TO WHIPPLE AVENUE IN REDWOOD CITY | 1 (07/05/2022) | Details CEM-3701 Report | |
7157 | Project ID: 7157 DEA: 042E4904 | 04-SM-1-0.0/3.3 | RUBBERIZED HOT MIX ASPHALT (GAP GRADED) OVERLAY. | SAN MATEO COUNTY FROM THE SANTA CRUZ / SAN MATEO COUNTY LINE TO 0.6 MILE NORTH OF CHAULK ROAD | 08/16/2013 | 1 (05/30/2012) | Details CEM-3701 Report |
7156 | Project ID: 7156 DEA: 042E4804 | 04-SM-92-0.7/3.2 | RUBBERIZED WARM MIX ASPHALT GAP GRADED OVERLAY. | SAN MATEO COUNTY IN AND NEAR HALF MOON BAY FROM 0.7 MILE EAST OF ROUTE 1 TO PLARCITOS CREEK ROAD | 11/20/2012 | NOT VERIFIED | Details CEM-3701 Report |
2129 | Project ID: 2129 DEA: 042A4104 | 04-SM-1-0.0/26.2,31.0/40.5 | INSTALL RUMBLE STRIP. | SAN MATEO COUNTY IN AND NEAR HALF MOON BAY FROM THE SANTA CRUZ/SAN MATEO COUNTY LINE TO 0.3 MILE SOUTH OF MIRAMONTE POINT ROAD AND FROM 0.8 MILE NORTH OF FRENCHMANS CREEK ROAD TO 0.3 MILE SOUTH OF SAN PEDRO ROAD | 03/05/2012 | 1 (08/28/2012) | Details CEM-3701 Report |
994568 | Project ID: 994568 DEA: 040Y1804 EFIS: 0422000254 | 04-SM-280-R1.0/R3.3 | INDIVIDUAL SLAB REPLACEMENT (RSC). | SAN MATEO COUNTY IN AND NEAR MENLO PARK AND WOODSIDE FROM STANFORD LINEAR ACCELERATOR UNDERCROSSING TO ROUTE 280/84 SEPARATION | 11/25/2024 | 1 (04/04/2023) | Details CEM-3701 Report |
1941 | Project ID: 1941 DEA: 041E7204 | 04-SM-92-7.3/13.9 | Cold plane and place rubberized hot mix asphalt (gap graded). | SAN MATEO COUNTY IN AND NEAR SAN MATEO AND FOSTER CITY FROM ROUTE 280/92 SEPARATION TO 0.3 MILE EAST OF FOSTER CITY BOULEVARD OVERCROSSING | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
994731 | Project ID: 994731 DEA: 040Y3004 EFIS: 0422000265 | 04-SM-92-R10.4/R12.0 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. | SAN MATEO COUNTY IN AND NEAR SAN MATEO FROM 0.2 MILE WEST OF ALAMEDA DE LAS PULGAS OVERCROSSING TO 92/101 SEPARATION | 03/04/2024 | 1 (05/09/2023) | Details CEM-3701 Report |
1907 | Project ID: 1907 DEA: 041E2504 | 04-SM-82-0.0/2.7 | Cold plane pavement and place hot mix asphalt (type A). | SAN MATEO COUNTY IN ATHERTON AND MENLO PARK FROM SANTA CLARA COUNTY LINE TO BERKSHIRE AVENUE | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
210302 | Project ID: 210302 DEA: 043E7904 EFIS: 0413000299 | 04-SM-101-23.7 | SPOT BLAST CLEAN AND PAINT THE ENTIRE STEEL GIRDERS AND BENT CAPS. | SAN MATEO COUNTY IN BRISBANE AT SIERRA POINT OVERHEAD | 12/27/2017 | 1 (07/09/2015) | Details CEM-3701 Report |