Displaying 15651-15660 of 17201 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993836Project ID: 993836
Permit Numbers: 05226DP0383 05216RT1025 0522NRD0156 05226RW0366 05226RW0656
05---0.08/0.13The work done within the state highway right-of-way will be demolition of the current pavement on Atascadero road in order to construct pavement, curb and gutter and sidewalk in its current location. Additionally, there will be improvements to the underground storm drain and water utilities, as con405 Atascadero Rd, Morro Bay 1 (05/23/2022)Details CEM-3701 Report
209661Project ID: 209661
DEA: 044H1404
EFIS: 0413000093
MINOR: 04A4471
04-NAP-128-18.5The work involves removing damaged sections of a CMP arch culvert, welding headed studs to the existing corrugation peaks, and then welding wire fabric to those studs. Finally, structural concrete is placed to create a new, smooth, invert.Nap-128-18.5, Soda Creek, Br. No 21-0062.06/08/20201 (06/09/2014)Details CEM-3701 Report
995505Project ID: 995505
Permit Numbers: 06226SN0463
06--SR119-The work is included as part of the development of the northeast corner of SR 119 and South H Street. The proposed development will be a Love's Truck Stop. As part of the off-site work, the northeast return in the intersection will be modified, which will trigger traffic signal modifications. AsNortheast corner of SR 119 and South H Street. 1 (11/27/2023)Details CEM-3701 Report
7750Project ID: 7750
EFIS: 0000001155
Permit Numbers: 0412NRW1674 04126DP1702 0411NMC1581 04116DP1861 04126DP1702
04-NAP--0.6/0.6The work on American Canyon Road consists of road rehabilitation (FDR AND HMA ),curb and gutter, median relocation, bike lanes, striping and pavement markings, traffic loops and replacement of a broken water valve.American Canyon Rd, American Canyon09/14/20181 (01/11/2013)Details CEM-3701 Report
7745Project ID: 7745
EFIS: 0000001155
Permit Numbers: 0412NMC0500
04-NAP-121-5.5/5.5The work proposed under this permit involves re-striping and minor signal work associated with adding a second left turn at the intersection of Imola Avenue(SR 121)and Gasser Dr. for the eastbound Imola to northbound Gasser Movement.Imola Ave. / Gasser Dr. Intersection, Napa09/14/20181 (09/17/2012)Details CEM-3701 Report
7885Project ID: 7885
Permit Numbers: 04126DP1745
04-NAP-121-5.5/5.5The work proposed under this permit involves re-striping and minor signal work associated with adding a second left turn at the intersection of Imola Avenue(SR 121)and Gasser Dr. for the eastbound Imola to northbound Gasser Movement.Imola Ave. / Gasser Dr. Intersection, Napa09/14/20181 (10/23/2012)Details CEM-3701 Report
213146Project ID: 213146
Permit Numbers: 0417NUC2741
04-SM-82-24.3/24.3The work that will be performed is located on Mission Street between the two driveways that provide access to 6967 Mission Street. The contractor will construct a new pole foundation 5 ft east of the existing streetlight location, relocate the existing streetlight fixture and pole, abandon the exis6967 Mission Street , Daly City11/30/00-11 (11/08/2019)Details CEM-3701 Report
993465Project ID: 993465
DEA: 041Q8504
EFIS: 0418000346
Permit Numbers: 0421NOP3462 04216DP3618
04---10.365The work to be done consists, in general, of clearing and grubbing, tree removal, demolition, site grading, site civil improvements, landscaping and irrigation, underground utilities, site striping and signage, drainage structures and storm drain pipes, traffic control system, site lighting, misc.954 Golden Gate Drive, Napa 1 (12/16/2021)Details CEM-3701 Report
7475Project ID: 7475
DEA: 04445604
EFIS: 0400001081
COOP: 042434
Permit Numbers: 0412NMC0872 0412NDP1643
04-SCL-280-5.1/5.2,0.0/0.8The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, wideningIn San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing05/07/20192 (12/11/2012)Details CEM-3701 Report
215565Project ID: 215565
Permit Numbers: 0320AOP1078
03-ED-50-16.4/16.8The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of PlacervilleN/A, Placerville 2 (04/19/2021)Details CEM-3701 Report