Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15651-15660 of 16643 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993436 | Project ID: 993436 DEA: 101K7204 EFIS: 1019000093 COOP: 101K720 Permit Numbers: 1021NMC0626 1021NDP0663 1022NRD0586 1022NRT0690 | 10---12/12.3 | Construct a roundabout. | SR 49, Jamestown | 1 (01/31/2022) | Details CEM-3701 Report | |
212546 | Project ID: 212546 Permit Numbers: 1016NMC0761 1017NDP0373 1018NRT0765 | 10---17.1/17.4 | Construct a single lane roundabout at the intersection of State Route 49 and Main Street in the City of Plymouth in Amador County. Work includes approach roadways modification, sidewalks, landscaping, underground and roadside drainage facilities, waterline replacement, retaining wall, lighting, and | SR 49, Plymouth | 1 (07/05/2017) | Details CEM-3701 Report | |
993395 | Project ID: 993395 Permit Numbers: 1017NMC0298 1021NRT1092 | 10---20.2/20.5 | To eliminate swing right turn lane, add designated right turn lane. | SR 49, Sonora | 08/30/2023 | 1 (11/04/2021) | Details CEM-3701 Report |
7012 | Project ID: 7012 EFIS: 0000001155 Permit Numbers: 1011NMC0204 | 10-SJ-5-16.5/16.5 | Widen, stripe, remove and relocate existing sidewalk, retaining curb, gutter, modify traffic signal and lighting, as shown on the plans, within Interstate 5 right of way at Louise Avenue in the City of Lathrop in San Joaquin County. This Permit also allow | SR 5, Lathrop | 10/09/2018 | 2 (08/07/2014) | Details CEM-3701 Report |
7718 | Project ID: 7718 EFIS: 0000001155 Permit Numbers: 1011NMC0253 | 10-SJ-5-17.52/17.52 | Widen existing Lathrop Road underneath I-5. | SR 5, Lathrop | 10/09/2018 | 2 (08/07/2014) | Details CEM-3701 Report |
993496 | Project ID: 993496 Permit Numbers: 1020NMC0853 1021NRT0929 1022NRT0574 | 10---16.5 | Relocate and upgrade existing traffic signal poles, restripe traveled lanes, widen pavement and install curb. | SR 5, Lathrop | 08/30/2023 | 1 (01/03/2022) | Details CEM-3701 Report |
993839 | Project ID: 993839 Permit Numbers: 1021NMC1168 | 10---17.554 | Modify the existing intersection of Lathrop Road. | SR 5, Lathrop | 08/30/2023 | 1 (05/13/2022) | Details CEM-3701 Report |
10021 | Project ID: 10021 DEA: 100E4904 EFIS: 1000000024 COOP: 100308 Permit Numbers: 1012NMC0250 1012NDP0569 | 10-SJ-5-22/23.6 | Reconfigure the existing interchange to create a partial Type L-9 partial cloverleaf, widen the existing undercrossing structure, construct new loops on-ramps, and construct auxiliary lanes on I-5 from French Camp Road to Downing Avenue, and modify traffi | SR 5, Stockton | 03/09/2020 | 1 (02/22/2013) | Details CEM-3701 Report |
213773 | Project ID: 213773 Permit Numbers: 1015NMC0093 1017NRT0103 1018NDP0719 1018NRT0689 | 10---29.8 | Install adaptive traffic signal system at the Interstate Route 5 interchange with March Lane in Stockton, as shown on the approved plans. The system will include the installation of Model 2070E traffic signal controller with GPS clocks and GPS antenna in existing controller cabinets, and replaceme | SR 5, Stockton | 11/09/2021 | 1 (11/15/2018) | Details CEM-3701 Report |
209184 | Project ID: 209184 DEA: 031E2904 EFIS: 0300000258 Permit Numbers: 0313NMC0522 | 03-ED-US 50-1.02/2.4 | Construct New Silva Valley Parkway interchange | SR 50 between the El Dorado Hills Boulevard/Latrobe Road interchange and the Bass Lake Road interchange, just east of the Clarksville Undercrossing along the existing Sylva Valley Parkway | 12/05/2017 | 1 (12/19/2013) | Details CEM-3701 Report |