Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15621-15630 of 16094 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994113 | Project ID: 994113 DEA: 061E6904 EFIS: 0622000084 | 06-TUL-99-9.8/40.7 | LANDSCAPE PLANTING, IRRIGATION, AND PLANT ESTABLISHMENT. | TULARE COUNTY IN AND NEAR TEVISTON AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF AVENUE 76 TO 0.1 MILE SOUTH OF BETTY DRIVE | 1 (07/14/2022) | Details Personnel CEM-3701 Report | |
214277 | Project ID: 214277 DEA: 060R1704 EFIS: 0614000051 | 06-TUL-99-28.3/31.0 | MINOR CONCRETE (EXPOSED AGGREGATE CONCRETE). | TULARE COUNTY IN AND NEAR TULARE FROM 0.3 MILE SOUTH OF BARDSLEY AVENUE OVERCROSSING TO 0.4 MILE NORTH OF PROSPERITY AVENUE OVERCROSSING | 07/15/2021 | 1 (08/05/2019) | Details Personnel CEM-3701 Report |
212599 | Project ID: 212599 DEA: 06332214 EFIS: 0616000123 | 06-TUL-99-31.2/32.5 | HIGHWAY PLANTING, IRRIGATION, AND PLANT ESTABLISHMENT. | TULARE COUNTY IN AND NEAR TULARE FROM 0.7 MILE SOUTH TO 0.6 MILE NORTH CARTMILL AVENUE OVERCROSSING | 11/23/2021 | 1 (05/07/2018) | Details Personnel CEM-3701 Report |
208842 | Project ID: 208842 DEA: 060E6704 EFIS: 0600020035 | 06-TUL-99-6.1/29.9 | PAINT BRIDGE AND CONSTRUCT SLOPE PAVING. | TULARE COUNTY IN AND NEAR TULARE FROM AVENUE 48 TO CROSS AVENUE | 10/08/2014 | NOT VERIFIED | Details Personnel CEM-3701 Report |
209349 | Project ID: 209349 DEA: 060P1704 EFIS: 0612000109 | 06-TUL-99-25.0/27.6 | REPLACE FAILED CONCRETE PANELS WITH HMA, AND PAVE WITH RHMA-SP-G. | TULARE COUNTY IN AND NEAR TULARE FROM ELK BAYOU BRIDGE TO PAIGE AVENUE OVERCROSSING | 12/14/2020 | 1 (12/24/2014) | Details Personnel CEM-3701 Report |
993426 | Project ID: 993426 DEA: 061C3604 EFIS: 0621000162 | 06-TUL-63-0.0/2.0 | COLD PLANE AC, PLACE HMA (TYPE A) AND RHMA-G. | TULARE COUNTY IN AND NEAR TULARE FROM ROUTE 137 TO EAST CARTMILL AVENUE | 11/30/2022 | 1 (12/06/2021) | Details Personnel CEM-3701 Report |
3450 | Project ID: 3450 DEA: 06446704 | 06-TUL-216-2.9/11.7 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY IN AND NEAR VISALIA FROM 0.4 MILE EAST OF MCAULIFF STREET TO AVENUE 344 | 12/13/2012 | 1 (10/11/2010) | Details Personnel CEM-3701 Report |
10017 | Project ID: 10017 DEA: 06430704 EFIS: 0600000425 | 06-TUL-216-1.9/2.9 | WIDENING AND REALIGNMENT OF ROUTE 216. | TULARE COUNTY IN AND NEAR VISALIA FROM LOVERS LANE TO 0.1 MILE EAST OF COMSTOCK STREET | 07/30/2015 | 1 (09/26/2013) | Details Personnel CEM-3701 Report |
210483 | Project ID: 210483 DEA: 06430714 EFIS: 0613000056 | 06-TUL-216-1.9/2.9 | INSTALL LANDSCAPING. | TULARE COUNTY IN AND NEAR VISALIA FROM LOVERS LANE TO 0.1 MILE EAST OF COMSTOCK STREET | 12/26/2018 | 1 (07/21/2015) | Details Personnel CEM-3701 Report |
212686 | Project ID: 212686 DEA: 060S3404 EFIS: 0614000114 | 06-TUL-198-R11.7/R19.7 | REMOVE AND PLACE HMA PAVEMENT AND MODIFY DRAINAGE SYSTEM, | TULARE COUNTY IN AND NEAR VISALIA FROM LOVERS LANE UNDERCROSSING TO 0.1 MILE EAST OF FRIANT-KERN CANAL BRIDGE | 10/15/2020 | 1 (02/13/2018) | Details Personnel CEM-3701 Report |