Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15621-15630 of 16643 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
737Project ID: 737
Permit Numbers: 0304NSN0548
03-SAC-16-4.16/4.17Signal-New / ModifySR 16 and South Watt Avenue, Sacramento09/17/2014NOT VERIFIEDDetails CEM-3701 Report
761Project ID: 761
EFIS: 0000001155
Permit Numbers: 03076SN0948
03-GLE-162-65.3/65.84Signal-New / ModifySr 162 and North and South bound ramps, Willows09/17/2014NOT VERIFIEDDetails CEM-3701 Report
208934Project ID: 208934
Permit Numbers: 10126RC0449 10126DP0760 10136RW0186
10-MER-165-10.149/10.149Construct the commercial driveway with landscape, sidewalk, ADA ramp, match existing curb, gutter, and restriping for left turn lane, as shown on the approved plans, in accordance to the State Standards and Specifications along State Highway 165 right ofSR 165, Los Banos01/16/20141 (06/18/2013)Details CEM-3701 Report
209003Project ID: 209003
Permit Numbers: 10136UL0343
10-MER-165-11.5/11.5Trench to place new 10'x10'x6" concrete Vrad pad and Vrad cabinet; 3'x3x6" concrete pad and power pedestal; 6'x4'x6" concrete pad and upgrade existing SAI cabinet within the Public Utility easement (PUE) area, as shown on the attachments, along State HighSR 165, Los Banos08/24/20181 (08/07/2014)Details CEM-3701 Report
208873Project ID: 208873
DEA: 060C9404
EFIS: 0600000041
COOP: 061527
Permit Numbers: 0613NMC0448
06-KER-178-7/9.1Enter upon the State Highway Right-of-way on State Route 178 (SR-178) in Bakersfield at and near the SR-178/Morning Drive intersection (PM R7.0) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of BakersfiSR 178, Bakersfield12/31/20152 (07/24/2013)Details CEM-3701 Report
4948Project ID: 4948
DEA: 080H8104
08-SBD-18-20.6REMOVAL OF DEAD TREES ALONG EVAC. ROUTESSR 18 PM 20.6 TO PM 39.5 200' TO C/L07/29/20101 (07/29/2010)Details CEM-3701 Report
3019Project ID: 3019
Permit Numbers: 06086CD0326 0610NRW0005
06-FRE-180-42.639/42.639Widen the southeast corner of intersection of State Routes 145 and 180. Remove and replace existing curb, ramps, gutter and sidewalk. Restripe crosswalks in intersection. Modify signal system. Replace signal pole in southeast corner. Replace controlSR 180 and SR 145, Kerman04/27/20182 (11/21/2014)Details CEM-3701 Report
210519Project ID: 210519
Permit Numbers: 0615AOP0265
06---14.6Enter upon the State Highway Right-of-way on State Route 198 (SR 198) in Tulare County at Noble Avenue and SR 198 eastbound ramps at approximate PM R14.60, to set up, maintain, and remove temporary traffic control necessary to construct the City of Farmersville Single-Lane Roundabout Project No. 06SR 198 EB Ramps, Farmersville11/30/00-12 (01/17/2019)Details CEM-3701 Report
215362Project ID: 215362
Permit Numbers: 10206MC0075 10216RT0422
10---8.152Modify westbound MacArthur I-205 off ramp work which includes adding a new 12-foot left-turn pocket to match existing structural pavement section and to conform to the existing grade, new shoulders, striping of left turn pockets and through lanes under the freeway, and modification of traffic signaSR 205, Tracy03/03/20221 (12/10/2020)Details CEM-3701 Report
215480Project ID: 215480
Permit Numbers: 10196MC0702
10---1.373Construct approximately 150' concrete curb & gutter, AC grind & overly, and replace electrical loops located at International Parkway and I-205 eastbound on-ramp intersection in the City of Tracy. All work shall conform to the approved plans and special provisions per Caltrans Standard SSR 205, Tracy03/03/20221 (02/12/2021)Details CEM-3701 Report