Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15611-15620 of 17622 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213903Project ID: 213903
DEA: 043G4544
EFIS: 0412000054
04-ALA,SM-92-R14.4/R18.8,R0.0/R.2.4Repair Spalled Concrete Columns and Spandrel BeamsSan Mateo-Hayward Bridge 1 (01/22/2019)Details CEM-3701 Report
211908Project ID: 211908
Permit Numbers: 04166DP1823 0414NMC2026 04166RW1963 0416NRW1948
04--123-4.1/4.4Improvements include constructing multi-use pathway along SB San Pablo Ave. from 150 feet south of Dartmouth street to 400 feet north of Monroe Street.San Pablo Ave, Albany01/18/20191 (01/06/2017)Details CEM-3701 Report
209987Project ID: 209987
Permit Numbers: 0413NMC1846
04-ALA-123-0.1/0.4The project is funded by a Safe routes to Transit grant to improve mobility for bicyclists and pedestrians at the intersections of Pablo Ave/40th Street and San Pablo Ave./Adeline Street/W. Macarthur Blvd.San Pablo Ave, Emeryville10/22/20191 (10/08/2014)Details CEM-3701 Report
1750Project ID: 1750
Permit Numbers: 04106DP0094
04-CC-123-0/2.1Construct landscape improve including tree, shrub, and plant installation and/or replacement.SAN PABLO AVE., EL CERRITO08/20/2018NOT VERIFIEDDetails CEM-3701 Report
8159Project ID: 8159
Permit Numbers: 0412NMC0383 04136DP0013 0413NRW0185
04-ALA-123-4.4/4.43The San Pablo and Marin Avenue intersection consists of the following improvements:1. ADA compliant curb ramps.2. High visibility crosswalk in all four reaches of the intersection.3. Modified signal timing and equipment for eastbound bike/ped phase.4. AddSan Pablo Avenue , Albany10/21/20141 (11/28/2012)Details CEM-3701 Report
994424Project ID: 994424
DEA: 042Y2804
EFIS: 0423000094
COOP: 042899
04-ALA--Implement pedestrian and bicycle crossing safety enhancements and bus transit improvements along San Pablo Avenue in the Cities of Berkeley and Albany. Project improvements include high visibility crosswalks, intersection lighting etc.San Pablo Avenue in cities of Berkeley and Albany 2 (05/09/2023)Details CEM-3701 Report
211294Project ID: 211294
Permit Numbers: 0413NMC0652 0414NRD2149 04166DP0680 0414NMC0652
04-ALA-123-0.4/0.8New bulb-outs median modification,and storm drain line modification at 45th street.San Pablo Avenue, Emeryville01/18/20191 (04/14/2016)Details CEM-3701 Report
213661Project ID: 213661
Permit Numbers: 04176SN1102 04186DP1813 0418NRW2706
04---1.78/1.78Install a new signal as part of a new building at the intersection of San Pablo Avenue and 67th Street. The work will include installation of a new controller cabinet, service cabinet, traffic signal poles and equipment, conduits, detector loops, emergency vehicle preemption equipment.San pablo Avenue, Oakland10/22/20191 (10/01/2018)Details CEM-3701 Report
208946Project ID: 208946
DEA: 040A0814
EFIS: 0413000365
COOP: 042502
Permit Numbers: 0415NMC0806
04-CC--3.8/5.3Reconstruct El Portal Drive WB on-ramp, (b) extending auxiliary lanes along I-80 WB between new El Portal Dr. WB on-ramp to San Pablo Dam Rd. WB off-ramp, (c) realigning El Portal, (d) sliver widening on EB 80 mainline and (e) reconstruct median barrierSan Pablo Dam Road07/12/20192 (12/18/2015)Details CEM-3701 Report
993600Project ID: 993600
Permit Numbers: 0421NMC1750 0422NRD0223 04226DP0044
04-ALA--2.45This project will install a new traffic signal at the San Pablo Avenue (CALTRANS Route 123)/Parker Street intersection. The project will also install a new controller at the northwest corner, within the CALTRANS right-of-way. The new traffic signal wouldSan Pablo/Parker, Berkeley 1 (03/09/2022)Details CEM-3701 Report