Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15601-15610 of 15952 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993897 | Project ID: 993897 DEA: 030H6004 | 03-VAR-- | Install smaller horsepower pumps | 06/27/2022 | 1 (06/27/2022) | Details Personnel CEM-3701 Report | |
993898 | Project ID: 993898 DEA: 030H6104 | 03-COL-5- | Install new irrigation system | 06/27/2022 | 1 (06/27/2022) | Details Personnel CEM-3701 Report | |
993899 | Project ID: 993899 DEA: 030H6204 | 03-VAR-- | Install SMART controllers | 06/27/2022 | 1 (06/27/2022) | Details Personnel CEM-3701 Report | |
993900 | Project ID: 993900 DEA: 07308704 | 07-LA-5-31.4 | Upgrade existing irrigation systems | 1 (09/22/2022) | Details Personnel CEM-3701 Report | ||
993901 | Project ID: 993901 DEA: 07308904 | 07-LA-101- | Upgrade existing irrigation systems | 1 (09/22/2022) | Details Personnel CEM-3701 Report | ||
993903 | Project ID: 993903 DEA: 030H2504 | 03-SAC-51-4 | repair culvert by jack and bore method | 06/27/2022 | 1 (06/27/2022) | Details Personnel CEM-3701 Report | |
993904 | Project ID: 993904 DEA: 042J4204 | 04-SM-1-47.1 | washout along shoulder | 1 (07/21/2022) | Details Personnel CEM-3701 Report | ||
993909 | Project ID: 993909 DEA: 120T8504 EFIS: 1222000108 | 12-ORA/ORA-5,22,405-42.0/42.0, 10.43/10.43, .95/.95 | Remove the old failed joint assembly units placing new steel joint assembly units, place trafficrated steel plates over the failed joint assembly units | 1 (07/26/2022) | Details Personnel CEM-3701 Report | ||
993910 | Project ID: 993910 DEA: 081N3304 EFIS: 0822000162 | 08-SBD/SBD-18-20.6/23.4 | Reconstruct embankment, remove masonry gravity walls, construct retaining systems, replace AC pavement, reinforce base, and rock scaling. | 01/23/2023 | 1 (01/23/2023) | Details Personnel CEM-3701 Report | |
993911 | Project ID: 993911 DEA: 071XY804 EFIS: 0722000229 | 07-LA/LA-47-RO 42/1.98 | Fabricate and paint metal cable guards and install them onto the main cables of the Vincent Thomas Bridge | 1 (07/22/2022) | Details Personnel CEM-3701 Report |