Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15521-15530 of 17618 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2135 | Project ID: 2135 DEA: 042A6304 EFIS: 0400000833 | 04-SON-1-16.1/19.7 | ROADSIDE DRAINAGE IMPROVEMENT AND HOT MIX ASPHALT (A) OVERLAY. | SONOMA COUNTY FROM 0.8 MILE NORTH OF SCOTTY CREEK BRIDGE TO RUSSIAN RIVER BRIDGE | 01/17/2014 | 1 (07/13/2010) | Details CEM-3701 Report |
2134 | Project ID: 2134 DEA: 042A5434 | 04-SM-280-7.6 | CONSTRUCT RETAINING WALL AND ADA COMPLIANT SIDEWALK. | SAN MATEO COUNTY ABOUT 0.6 MILE WEST OF SAN CARLOS AT PULGAS RIDGE VISTA POINT | 08/31/2012 | 1 (08/31/2012) | Details CEM-3701 Report |
2133 | Project ID: 2133 DEA: 042A5424 | 04-SM,SCL-280,35-Var | UPGRADING VISTA POINT FOR ADA COMPLIANCE. | SAN MATEO AND SANTA CLARA COUNTIES ON VARIOUS FREEWAYS AT VARIOUS LOCATIONS | 06/08/2011 | 1 (04/26/2011) | Details CEM-3701 Report |
2132 | Project ID: 2132 DEA: 042A5414 | 04-NAP-29-6.0 | Reconstruct sidewalk and install pipe hand railing. | NAPA COUNTY ABOUT 3.8 MILES SOUTH OF NAPA COUNTY AT NAPA VISTA POINT | 03/05/2012 | 1 (03/22/2012) | Details CEM-3701 Report |
2131 | Project ID: 2131 DEA: 042A4604 | 04-MRN-37-12.0/13.7 | DOUBLE THRIE BEAM BARRIER | 04/18/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
2130 | Project ID: 2130 DEA: 042A4204 EFIS: 0400000821 COOP: 2260CS | 04-SCL-101-14.5/15.4 | Route 101/Tennant Ave. Interchange Improvements Project | Rte 101/Tennant Ave. | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
2129 | Project ID: 2129 DEA: 042A4104 | 04-SM-1-0.0/26.2,31.0/40.5 | INSTALL RUMBLE STRIP. | SAN MATEO COUNTY IN AND NEAR HALF MOON BAY FROM THE SANTA CRUZ/SAN MATEO COUNTY LINE TO 0.3 MILE SOUTH OF MIRAMONTE POINT ROAD AND FROM 0.8 MILE NORTH OF FRENCHMANS CREEK ROAD TO 0.3 MILE SOUTH OF SAN PEDRO ROAD | 03/05/2012 | 1 (08/28/2012) | Details CEM-3701 Report |
2128 | Project ID: 2128 DEA: 042A3104 | 04-SM-82-21.9 | INSTALL RAISED SEPARATOR SYSTEM | IN SAN MATEO COUNTY IN COLMA ANDSOUTH SAN FRANCISCO FROM HICKEY BOULEVARD TO MISSION ROAD | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
2127 | Project ID: 2127 DEA: 042A1404 EFIS: 0400000809 | 04-SF-80,101-L3.8/5.0,4.1/5.0 | BAYSHORE VIADUCT REHABILITATION | BAYSHORE AND CENTRAL VIADUCTS | 08/22/2018 | 1 (08/28/2012) | Details CEM-3701 Report |
2126 | Project ID: 2126 DEA: 042A0904 EFIS: 0400000807 | 04-CC-680-24.9 | CLOSEOUT | 1 (07/05/2011) | Details CEM-3701 Report |