Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15491-15500 of 15954 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
10017 | Project ID: 10017 DEA: 06430704 EFIS: 0600000425 | 06-TUL-216-1.9/2.9 | WIDENING AND REALIGNMENT OF ROUTE 216. | TULARE COUNTY IN AND NEAR VISALIA FROM LOVERS LANE TO 0.1 MILE EAST OF COMSTOCK STREET | 07/30/2015 | 1 (09/26/2013) | Details Personnel CEM-3701 Report |
210483 | Project ID: 210483 DEA: 06430714 EFIS: 0613000056 | 06-TUL-216-1.9/2.9 | INSTALL LANDSCAPING. | TULARE COUNTY IN AND NEAR VISALIA FROM LOVERS LANE TO 0.1 MILE EAST OF COMSTOCK STREET | 12/26/2018 | 1 (07/21/2015) | Details Personnel CEM-3701 Report |
212686 | Project ID: 212686 DEA: 060S3404 EFIS: 0614000114 | 06-TUL-198-R11.7/R19.7 | REMOVE AND PLACE HMA PAVEMENT AND MODIFY DRAINAGE SYSTEM, | TULARE COUNTY IN AND NEAR VISALIA FROM LOVERS LANE UNDERCROSSING TO 0.1 MILE EAST OF FRIANT-KERN CANAL BRIDGE | 10/15/2020 | 1 (02/13/2018) | Details Personnel CEM-3701 Report |
210026 | Project ID: 210026 DEA: 060Q6504 EFIS: 0613000159 MINOR: 06A1965 | 06-TUL-216-6.2/17.7 | Install Cured in-place pipeliner | TULARE COUNTY IN AND NEAR WOODLAKE AT VARIOUS LOCATIONS FORM 0.2 MILE SOUTH OF JASMINE AVENUE TO 1.0 MILE SOUTH OF KAWEAH RIVER BRIDGE. | 03/15/2021 | 1 (12/29/2014) | Details Personnel CEM-3701 Report |
211983 | Project ID: 211983 DEA: 060T7604 EFIS: 0615000227 | 06-TUL-216-11.7/19.3 | REPAIR FAILED AC PAVEMENT AND RESURFACE WITH RHMA-GAP GRADED (BWC). | TULARE COUNTY IN AND NEAR WOODLAKE FROM 0.2 MILE EAST OF ROAD 192 TO ROUTE 198 | 10/10/2017 | 1 (10/10/2017) | Details Personnel CEM-3701 Report |
214200 | Project ID: 214200 DEA: 060W9604 EFIS: 0617000290 MINOR: 06A2540 | 06-TUL-63-R23.6 | Install Highway lighting and type E loop detectors | Tulare COunty in Orosi At Miller Ave | 1 (06/13/2019) | Details Personnel CEM-3701 Report | |
212902 | Project ID: 212902 DEA: 060S3104 EFIS: 0614000105 | 06-TUL-190-R15.1/17.0 | CONSTRUCT MEDIAN CONCRETE BARRIER AND WIDEN INSIDE SHOULDER. | TULARE COUNTY IN PORTERVILLE FROM SOUTH PROSPECT STREET TO SOUTH PLANO STREET | 06/26/2019 | 1 (05/17/2018) | Details Personnel CEM-3701 Report |
213965 | Project ID: 213965 DEA: 060S3114 EFIS: 0618000088 | 06-TUL-190-R15.1/16.9 | REPLACEMENT PLANTING AND IRRIGATION. | TULARE COUNTY IN PORTERVILLE FROM SOUTH PROSPECT STREET TO SOUTH PLANO STREET | 11/22/2021 | 1 (04/11/2019) | Details Personnel CEM-3701 Report |
215076 | Project ID: 215076 DEA: 060U7304 EFIS: 0616000028 | 06-TUL-65,190-17.5/22.0,15.0/18.5 | INSTALL MVP, GORE PAVING AND RELOCATE CONTROL SYSTEMS. | TULARE COUNTY IN PORTERVILLE ON ROUTE 65 AT VARIOUS LOCATIONS FROM 0.4 MILE NORTH OF AVENUE 136 TO 0.2 MILE NORTH OF LINDA VISTA AVENUE AND ON ROUTE 190 AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF ROUTE 65/190 SEPARATION TO BLUE HERON PARKWAY | 10/03/2022 | 1 (07/28/2020) | Details Personnel CEM-3701 Report |
7612 | Project ID: 7612 DEA: 060N8504 EFIS: 0600020699 | 06-TUL-99-23.5 | REPAIR BRIDGE. | TULARE COUNTY IN TULARE AT AVENUE 184 OVERCROSSING | 10/25/2013 | 1 (11/19/2012) | Details Personnel CEM-3701 Report |