Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15461-15470 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1680 | Project ID: 1680 DEA: 040E6904 | 04-MRN-1-19.8 | ASPHALT CONCRETE DIGOUTS | IN MARIN COUNTY IN MARIN FROM 2.6 MILES NORTH OF BOLINAS ROAD TOOLEMA CREEK BRIDGE | 04/18/2011 | 1 (04/18/2011) | Details CEM-3701 Report |
5108 | Project ID: 5108 DEA: 080M9204 MINOR: 08A1861 | 08-SBD-138-3.62 | Asphalt Concrete | On Rte 138 in SBd County near Sheep Creek Bridge | 01/11/2011 | NOT VERIFIED | Details CEM-3701 Report |
1224 | Project ID: 1224 DEA: 033M6004 | 03-PLA-267-3.7/6.7 | ASHPALT CONCRETE SURFACING | PLACER COUNTY NEAR TRUCKEE FROM 0.1 MILE WEST OF NORTHSTAR DRIVE TO BROCKWAY SUMMIT | 10/25/2010 | 1 (01/11/2010) | Details CEM-3701 Report |
213821 | Project ID: 213821 Permit Numbers: 03186TN1303 | 03--70-1.2/1.2 | AsBuilts Install approximately 330 feet of 48" drain pipe and 60" steel casing east to west from the River Oaks Detention Basin, under SR 70, and terminating in the Algodon Slough/Canal. | State Route 70, Plumas Lake | 1 (10/05/2020) | Details CEM-3701 Report | |
215752 | Project ID: 215752 Permit Numbers: 0319NCS1389 | 03-SAC-99-20.85 | ASB Restripe 47th avenue, slurry seal, rebuild raised medians. Install ADA sidewalks,curb, gutter and traffic signal modifications. | 47th Avenue, Sacramento | 08/22/2022 | 1 (05/26/2021) | Details CEM-3701 Report |
213820 | Project ID: 213820 Permit Numbers: 0318NUJ1318 | 03--80-14.96/14.96 | ASB Jack and bore under I-80 and install 20" steel pipe | Interstate-80, Newcastle | 05/14/2020 | NOT VERIFIED | Details CEM-3701 Report |
214754 | Project ID: 214754 Permit Numbers: 0319NSN0166 | 03---33.36 | ASB Install signal, widen Elkhorn, hand holes, conduits, modify existing striping & signage, relocate street light, and install new interconnect with new signal to serve future Greenbriar project signals.This work started under cancelled permit 0318-NSN0534. It was cancelled because the scope o | Elkhorn Boulevard, Sacramento | 04/07/2021 | 1 (03/16/2020) | Details CEM-3701 Report |
212016 | Project ID: 212016 Permit Numbers: 04166DP2697 0415NMC1245 | 04-ALA-238-7.9/7.9 | As part of the HWY safety improvement project,this federally funded project will improve the safety of the intersection at Mission Blvd (Route 238) and Blanche St. currently,the pedestrian crosswalk is unprotected and is a route to an existing school on the east side of Mission Blvd. | Mission Blvd, Hayward | 11/30/00-1 | NOT VERIFIED | Details CEM-3701 Report |
211422 | Project ID: 211422 Permit Numbers: 04166DP0370 0415NSN1457 04176RT0232 0417NRT0118 | 04----1/-1 | As part of the El Camino Real crosswalk improvements project (City project. | El Camino Real, Santa Clara | 01/18/2019 | 1 (04/19/2016) | Details CEM-3701 Report |
993449 | Project ID: 993449 EFIS: 0000001157 Permit Numbers: 0421NMC0745 0421NRT3817 | 04-SCL--22.665 | As part of a larger complete streets and green infrastructure project, the work within the STATE Highway right-of-way will:Perform clearing and grubbing. Remove concrete. Grind 2" AC repave with 2" RHMA. Rebuild PCC sidewalks and curb ramps on 3 of 4 comers. Shorten the curb radius on 2 co | ECR, Palo Alto | 1 (12/17/2021) | Details CEM-3701 Report |