Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15431-15440 of 16329 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
208826 | Project ID: 208826 DEA: 060G8504 EFIS: 0600020167 COOP: 061535 Permit Numbers: 0613NMC0437 | 06-KER-58-52.7/55.5 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the C | SR58, Bakersfield | 08/27/2018 | 2 (07/24/2013) | Details Personnel CEM-3701 Report |
5524 | Project ID: 5524 EFIS: 0000001155 Permit Numbers: 1007NMC0669 10086DP0495 | 10-AMA-88-22.69/22.69 | Construct new right turn lane, lengthen storage of left turn, modify existing signal and loops, as shown on the attached plans and electrical specifications, within State Highway 88 right of way at Ridge Road in the Town of Pine Grove in Amador County. T | SR88 @ Ridge Road, Pine Grove | 02/24/2014 | NOT VERIFIED | Details Personnel CEM-3701 Report |
3381 | Project ID: 3381 EFIS: 0000001155 Permit Numbers: 0610NMC0429 | 06-MAD-99-13.15/13.15 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near PM 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 Overcrossing Project | SR99, Madera | 06/11/2018 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |
3389 | Project ID: 3389 EFIS: 0000001155 Permit Numbers: 0611NDP0645 | 06-MAD-99-13.15/13.15 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near Post Mile 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 Overcrossing | SR99, Madera | 07/30/2018 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |
209257 | Project ID: 209257 DEA: 031E4101 EFIS: 0300000261 Permit Numbers: 0312NMC0802 | 03-SAC-99-12.34/12.91 | Construct hook on-ramp to NB 99 and extend off-ramp | SR99/Elk Grove Blvd, Elk Grove | 04/27/2018 | 2 (01/09/2014) | Details Personnel CEM-3701 Report |
5563 | Project ID: 5563 DEA: 100G2004 | 10-STA-4-R1.7 | CONSTRUCT ROCK SLOPE PROTECTION | STA county | 04/17/2011 | 1 (12/07/2009) | Details Personnel CEM-3701 Report |
209953 | Project ID: 209953 DEA: 100X3204 EFIS: 1012000212 | 10-STA,MER-108,165-33.1/36.1,30.0/32.4, | COLD PLANE AC PAVEMENT AND CONSTRUCT RUMBLE STRIPS. | STANISLAUS AND MERCED COUNTIES ON ROUTE 108 FROM EIGHTH STREET TO CRANE ROAD AND ON ROUTE 165 FROM WESTSIDE BOULEVARD TO WILLIAMS AVENUE | 02/23/2016 | 1 (10/28/2014) | Details Personnel CEM-3701 Report |
212861 | Project ID: 212861 DEA: 101H2801 EFIS: 1017000190 | 10-MER-5-15.12 | Bridge deck overlay with polyester concrete, replace approach slabs & joint seals in Stanislaus County on state route 5 from Fink Road UC to Khalsa Road UC. | Stanislaus and Merced Counties. | 1 (03/23/2020) | Details Personnel CEM-3701 Report | |
214525 | Project ID: 214525 DEA: 100W6304 EFIS: 1012000021 | 10-STA,SJ-5-27.0/27.4,0.9 | REPLACE WASTEWATER SYSTEM. | STANISLAUS AND SAN JOAQUIN COUNTIES ABOUT 9 MILES NORTHWEST OF PATTERSON AT THE WESTLEY SAFETY ROADSIDE REST AREA AND ABOUT 0.9 MILE NORTH OF THE COUNTY LINE | 1 (11/19/2019) | Details Personnel CEM-3701 Report | |
211278 | Project ID: 211278 DEA: 101E0004 EFIS: 1015000060 | 10-STA,SJ-33-18.0/27.1,0.0/5.0 | RUBBERIZED HOT MIX ASPHALT RESURFACING. | STANISLAUS AND SAN JOAQUIN COUNTIES AT AND NEAR WESTLEY FROM ROGERS ROAD TO LEHMAN ROAD | 11/14/2016 | 1 (06/23/2016) | Details Personnel CEM-3701 Report |