Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15421-15430 of 16967 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212302Project ID: 212302
DEA: 080C70U4
EFIS: 0815000189
COOP: 081646
08-SBD-210-PM R 25The SR 210 Base Line Interchange project, in the City of Highland, includes widening of the Base Line overcrossing at the SR 210, along with additional ramp widening improvements for the northbound on-ramp, northbound off-ramp and southbound on-ramps.SR210 Lane Addition work proposes to improve SR 210 within the cities of Highland, Redlands, San Bernardino and unincorporated sections of San Bernardino County, 2 (01/15/2020)Details CEM-3701 Report
7218Project ID: 7218
EFIS: 0000001155
Permit Numbers: 04126DP0070
04-SON-12-PM 38.06-PM 38.36The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Br 09/14/2018NOT VERIFIEDDetails CEM-3701 Report
1590Project ID: 1590
EFIS: 0000001155
Permit Numbers: 0409NUS1283
04-SON-12-38.06/38.36The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 BroadwayBroadway, Sonoma09/14/2018NOT VERIFIEDDetails CEM-3701 Report
7188Project ID: 7188
EFIS: 0000001155
Permit Numbers: 0412NRT0193
04-SON-12-38.06/38.36The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 BroadwayBroadway, Sonoma01/21/2019NOT VERIFIEDDetails CEM-3701 Report
208855Project ID: 208855
Permit Numbers: 0411NMC2101 04136DP0567 0412NRW2027
04-SCL-82-16.7/16.7The Sunnyvale Ave. / Old San Francisco Road Intersection improvement Project proposes to reconstruct and improve the Sunnyvale Ave/Old San Francisco Road intersection, providing a signalized left turn for southbound Sunnyvale Ave. to eastbound old San FranSunnyvale Ave. / Old San Francisco Rd. Intersection, Sunnyvale09/14/20181 (08/05/2013)Details CEM-3701 Report
994344Project ID: 994344
DEA: 041W7004
EFIS: 0421000075
COOP: 042902
04-ALA-I-580-9.3/ 10.1The Vasco Road/I-580 Interchange Improvements to enhance safety, improve operational deficiencies and provide bicycle and pedestrian facilities throughout the interchangeVasco Road/I-580 Interchange 2 (05/09/2023)Details CEM-3701 Report
7671Project ID: 7671
EFIS: 0000001155
Permit Numbers: 04116MC1727
04-SON-101-The widening of E. Washington west of the Washington & HWY 101 On-Ramp.The widening of E. Washington west of the Washington & HWY 101 On-Ramp.05/07/2019NOT VERIFIEDDetails CEM-3701 Report
209110Project ID: 209110
Permit Numbers: 0412NMC1476
04-SM-82-13.25/13.25The work consists of installing an 8" water main within El Camino Real.El Camino Real, Burlingame09/14/20181 (09/13/2013)Details CEM-3701 Report
993836Project ID: 993836
Permit Numbers: 05226DP0383 05216RT1025 0522NRD0156 05226RW0366 05226RW0656
05---0.08/0.13The work done within the state highway right-of-way will be demolition of the current pavement on Atascadero road in order to construct pavement, curb and gutter and sidewalk in its current location. Additionally, there will be improvements to the underground storm drain and water utilities, as con405 Atascadero Rd, Morro Bay 1 (05/23/2022)Details CEM-3701 Report
209661Project ID: 209661
DEA: 044H1404
EFIS: 0413000093
MINOR: 04A4471
04-NAP-128-18.5The work involves removing damaged sections of a CMP arch culvert, welding headed studs to the existing corrugation peaks, and then welding wire fabric to those studs. Finally, structural concrete is placed to create a new, smooth, invert.Nap-128-18.5, Soda Creek, Br. No 21-0062.06/08/20201 (06/09/2014)Details CEM-3701 Report