Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212302 | Project ID: 212302 DEA: 080C70U4 EFIS: 0815000189 COOP: 081646 | 08-SBD-210-PM R 25 | The SR 210 Base Line Interchange project, in the City of Highland, includes widening of the Base Line overcrossing at the SR 210, along with additional ramp widening improvements for the northbound on-ramp, northbound off-ramp and southbound on-ramps. | SR210 Lane Addition work proposes to improve SR 210 within the cities of Highland, Redlands, San Bernardino and unincorporated sections of San Bernardino County, | 2 (01/15/2020) | Details CEM-3701 Report | |
7218 | Project ID: 7218 EFIS: 0000001155 Permit Numbers: 04126DP0070 | 04-SON-12-PM 38.06-PM 38.36 | The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Br | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report | |
1590 | Project ID: 1590 EFIS: 0000001155 Permit Numbers: 0409NUS1283 | 04-SON-12-38.06/38.36 | The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Broadway | Broadway, Sonoma | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report |
7188 | Project ID: 7188 EFIS: 0000001155 Permit Numbers: 0412NRT0193 | 04-SON-12-38.06/38.36 | The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Broadway | Broadway, Sonoma | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
208855 | Project ID: 208855 Permit Numbers: 0411NMC2101 04136DP0567 0412NRW2027 | 04-SCL-82-16.7/16.7 | The Sunnyvale Ave. / Old San Francisco Road Intersection improvement Project proposes to reconstruct and improve the Sunnyvale Ave/Old San Francisco Road intersection, providing a signalized left turn for southbound Sunnyvale Ave. to eastbound old San Fran | Sunnyvale Ave. / Old San Francisco Rd. Intersection, Sunnyvale | 09/14/2018 | 1 (08/05/2013) | Details CEM-3701 Report |
994344 | Project ID: 994344 DEA: 041W7004 EFIS: 0421000075 COOP: 042902 | 04-ALA-I-580-9.3/ 10.1 | The Vasco Road/I-580 Interchange Improvements to enhance safety, improve operational deficiencies and provide bicycle and pedestrian facilities throughout the interchange | Vasco Road/I-580 Interchange | 2 (05/09/2023) | Details CEM-3701 Report | |
7671 | Project ID: 7671 EFIS: 0000001155 Permit Numbers: 04116MC1727 | 04-SON-101- | The widening of E. Washington west of the Washington & HWY 101 On-Ramp. | The widening of E. Washington west of the Washington & HWY 101 On-Ramp. | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
209110 | Project ID: 209110 Permit Numbers: 0412NMC1476 | 04-SM-82-13.25/13.25 | The work consists of installing an 8" water main within El Camino Real. | El Camino Real, Burlingame | 09/14/2018 | 1 (09/13/2013) | Details CEM-3701 Report |
993836 | Project ID: 993836 Permit Numbers: 05226DP0383 05216RT1025 0522NRD0156 05226RW0366 05226RW0656 | 05---0.08/0.13 | The work done within the state highway right-of-way will be demolition of the current pavement on Atascadero road in order to construct pavement, curb and gutter and sidewalk in its current location. Additionally, there will be improvements to the underground storm drain and water utilities, as con | 405 Atascadero Rd, Morro Bay | 1 (05/23/2022) | Details CEM-3701 Report | |
209661 | Project ID: 209661 DEA: 044H1404 EFIS: 0413000093 MINOR: 04A4471 | 04-NAP-128-18.5 | The work involves removing damaged sections of a CMP arch culvert, welding headed studs to the existing corrugation peaks, and then welding wire fabric to those studs. Finally, structural concrete is placed to create a new, smooth, invert. | Nap-128-18.5, Soda Creek, Br. No 21-0062. | 06/08/2020 | 1 (06/09/2014) | Details CEM-3701 Report |