Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15341-15350 of 17618 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211345 | Project ID: 211345 DEA: 101E5204 EFIS: 1015000181 | 10-SJ-120-R1.3/R3.9 | AUTOMATIC WARNING SYSTEM AND CONSTRUCT MVP. | SAN JOAQUIN COUNTY NEAR MANTECA AT VARIOUS LOCATIONS FROM GUTHMILLER ROAD UNDERCROSSING TO 0.5 MILE EAST OF AIRPORT WAY OVERCROSSING. | 02/14/2018 | 1 (06/23/2016) | Details CEM-3701 Report |
213055 | Project ID: 213055 DEA: 100E6144 EFIS: 1000020443 | 10-SJ-99-8.9/9.5 | REPLACE PLANTING, IRRIGATION WORK AND CONSTRUCT MONUMENT STRUCTURE. | SAN JOAQUIN COUNTY NEAR MANTECA FROM 1.0 MILE NORTH OF LOUISE AVENUE TO 0.3 MILE NORTH OF LATHROP ROAD | 12/07/2021 | 1 (12/13/2018) | Details CEM-3701 Report |
214886 | Project ID: 214886 DEA: 101H7804 EFIS: 1018000157 | 10-SJ-5929- | REHABILITATE MAINTENANCE BUILDING. | SAN JOAQUIN COUNTY NEAR STOCKTON AT DISTRICT 10 NORTH STOCKTON PAINT YARD AT 3330 NORTH AD ART ROAD | 10/19/2021 | 1 (04/08/2020) | Details CEM-3701 Report |
208760 | Project ID: 208760 DEA: 100W7204 EFIS: 1012000030 | 10-SJ-26-1.1 | HEAT STRAIGHTEN BRIDGE GIRDER. | SAN JOAQUIN COUNTY NEAR STOCKTON AT ROUTE 26/99 SEPARATION | 12/05/2013 | 1 (04/19/2013) | Details CEM-3701 Report |
993124 | Project ID: 993124 DEA: 101F1704 EFIS: 1016000032 | 10-SJ-26,99-1.1,19.3 | REMOVE AND REPLACE BRIDGE. | SAN JOAQUIN COUNTY NEAR STOCKTON AT ROUTE 26/99 SEPARATION | 08/30/2023 | 1 (07/23/2021) | Details CEM-3701 Report |
7181 | Project ID: 7181 DEA: 100V5904 EFIS: 1000020471 | 10-SJ-4-14.2 | CLEAN AND PAINT STRUCTURAL STEEL EXISTING BRIDGE. | SAN JOAQUIN COUNTY NEAR STOCKTON AT SAN JOAQUIN RIVER BRIDGE | 10/27/2014 | 1 (04/16/2012) | Details CEM-3701 Report |
7234 | Project ID: 7234 DEA: 100W1504 EFIS: 1000020438 | 10-SJ-99-20.1 | CLEAN AND PAINT STRUCTURAL STEEL EXISTING BRIDGE. | SAN JOAQUIN COUNTY NEAR STOCKTON AT STOCKTON DIVERTING CANAL | 01/04/2013 | 1 (06/18/2012) | Details CEM-3701 Report |
5803 | Project ID: 5803 DEA: 100T8704 | 10-SJ-99,132-18.6,5.8 | Replace bearing pads and repair abutment wall. | SAN JOAQUIN COUNTY NEAR STOCKTON AT WESTBOUND ROUTE 4 CONNECTOR OVERCROSSING AND AT VERNALIS AT ROUTE 132/33 SEPARATIONAND OVERCROSSING | 05/17/2011 | 1 (05/17/2011) | Details CEM-3701 Report |
5552 | Project ID: 5552 DEA: 100E9304 | 10-SJ-26-8.2/10.0 | WIDENING, COLD PLANE AND OVERLAY ROADWAY | SAN JOAQUIN COUNTY NEAR STOCKTON FROM 0.5 KM WEST OF PINASCO ROAD TO 0.5 KM EAST OF BEECHER ROAD | 01/04/2013 | 1 (05/25/2011) | Details CEM-3701 Report |
215615 | Project ID: 215615 DEA: 101L2304 EFIS: 1020000163 | 10-SJ-4-5.4/13.4 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND RESURFACE WITH HMA AND RHMA. | SAN JOAQUIN COUNTY NEAR STOCKTON FROM 1 MILE EAST OF MIDDLE RIVER BRIDGE TO 0.1 MILE WEST OF JOHN TURK ROAD | 01/31/2022 | 1 (04/21/2021) | Details CEM-3701 Report |